[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,11,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,249,261,273,285,295,307,319,331,343,355,367,379,391,403,415,427,439,451,463,475,487,499,511,523,535,547,559,571,583,595,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},898366,1,"单选题","关于建设工程竣工图的说法中，正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","工程竣工图是构成竣工结算的重要组成内容之一",false,{"key":24,"text":25,"correct":22},"B","改、扩建项目涉及原有工程项目变更的，应在原项目施工图上注明修改部分，并加盖“竣工图”标志后作为竣工图。",{"key":27,"text":28,"correct":29},"C","凡按图竣工没有变动的，由承包人在原施工图加盖“竣工图”标志后，即作为竣工图",true,{"key":31,"text":32,"correct":22},"D","当项目有重大改变需重新绘制时，不论何方原因造成，一律由承包人负责重绘新图","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},898367,"下列竣工财务决算说明书的内容，一般在项目概况部分予以说明的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目资金计算及到位情况",{"key":24,"text":41,"correct":29},"项目进度、质量情况",{"key":27,"text":43,"correct":22},"项目建设资金使用与结余情况",{"key":31,"text":45,"correct":22},"主要技术经济指标的分析、计算情况",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},898368,"某工业建设项目及其总装车间的建筑工程费、安装工程费、需安装设备费以及应摊入费用如下表所示，计算总装车间新增固定资产价值为（ ）万元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"2521.50",{"key":24,"text":53,"correct":22},"2099.66",{"key":27,"text":55,"correct":22},"2098.66",{"key":31,"text":57,"correct":29},"2099.67",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},898369,"某批进口设备离岸价为1000 万元人民币，国际运费为100 万元人民币，运输保险费费率为1%。则该批设备的关税完税价格应为（ ）万元人民币。",[62,64,66,68],{"key":20,"text":63,"correct":22},"1100.00",{"key":24,"text":65,"correct":22},"1110.00",{"key":27,"text":67,"correct":22},"1111.00",{"key":31,"text":69,"correct":29},"1111.11",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},898370,"某施工企业承包一个写字楼工程，竣工后计算得到工程造价为1110 万元（含增值税，施工企业为一般纳税人，税率为11%），则该企业应计的增值税为（ ）万元（不考虑进项税额）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"120",{"key":24,"text":77,"correct":29},"110",{"key":27,"text":79,"correct":22},"122",{"key":31,"text":81,"correct":22},"130",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},898371,"某建设项目静态投资20000 万元，项目建设前期年限为1 年，建设期为2 年，计划每年完成投资50%，年均投资价格上涨率为5%，该项目建设期价差预备费为（ ）万元。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1006.25",{"key":24,"text":89,"correct":22},"1525.00",{"key":27,"text":91,"correct":29},"2056.56",{"key":31,"text":93,"correct":22},"2601.25",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},898372,"通过计时观察，完成某工程的基本工时为6h\u002Fm3，辅助工作时间为工序作业时间的8%，规范时间占工作时间的15%，则完成该工程的时间定额是（ ）工日\u002Fm3。",[98,100,102,104],{"key":20,"text":99,"correct":22},"0.93",{"key":24,"text":101,"correct":22},"0.94",{"key":27,"text":103,"correct":22},"0.95",{"key":31,"text":105,"correct":29},"0.96",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},898373,"某砼输送泵每小时纯工作状态可输送砼25m，泵的试卷利用系数为0.75，则该砼输送泵的产量定额为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"150m3\u002F台班",{"key":24,"text":113,"correct":22},"0.67 台班\u002F100m3",{"key":27,"text":115,"correct":22},"200m3\u002F台班",{"key":31,"text":117,"correct":22},"0.50 台班\u002F100m3",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},898374,"某施工机械原值为50000 元，耐用总台班为2000 台班，一次大修费为3000 元，大修周期为4，台班经常修理费系数为20%，每台班发生的其他费用合计为30 元\u002F台班，忽略残值和资金时间价值，则该机械的台班单价为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"60.40",{"key":24,"text":125,"correct":22},"62.20",{"key":27,"text":127,"correct":22},"65.40",{"key":31,"text":129,"correct":22},"67.20",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},898375,"用水泥砂浆砌筑2m3砖墙，标准砖（240mm×115mm×53mm）的总耗用量为1113 块。已知砖的损耗率为5%，则标准砖、砂浆的净用量分别为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"1057 块、0.372m3",{"key":24,"text":137,"correct":22},"1057 块、0.454m3",{"key":27,"text":139,"correct":22},"1060 块、0.372m3",{"key":31,"text":141,"correct":29},"1060 块、0.449m3",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},898376,"已知砌筑1m3 砖墙中砖净量和损耗量分别为529 块、6 块，百块砖体积按0.146m3 计算，砂浆损耗率为10%。则砌筑1m3 砖墙的砂浆用量为（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":29},"0.250",{"key":24,"text":149,"correct":22},"0.253",{"key":27,"text":151,"correct":22},"0.241",{"key":31,"text":153,"correct":22},"0243",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},898377,"某工地商品混凝土分别从甲、乙两地采购，甲地采购量及材料单价分别为400m3、350 元\u002Fm3，乙地采购量及有关费用如下表所示。则该工地商品混凝土的材料单价应为（ ）元\u002Fm3。",[158,160,162,164],{"key":20,"text":159,"correct":22},"341.00",{"key":24,"text":161,"correct":29},"341.68",{"key":27,"text":163,"correct":22},"342.50",{"key":31,"text":165,"correct":22},"343.06",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},898378,"某挖掘机挖二类土方的台班产量定额为100m3\u002F台班，当机械幅度差系数为20%时，该机械挖二类土方1000m3 预算定额的台班耗用量应为（ ）台班。",[170,172,174,176],{"key":20,"text":171,"correct":22},"8.0",{"key":24,"text":173,"correct":22},"10.0",{"key":27,"text":175,"correct":29},"12.0",{"key":31,"text":177,"correct":22},"12.5",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},898379,"某工程项目报告期需采购设备甲2 台，设备乙1 台。报告期、基期设备价格如下表所示，该工程报告期的设备价格指数为（ ）",[182,184,186,188],{"key":20,"text":183,"correct":22},"1.00",{"key":24,"text":185,"correct":22},"1.13",{"key":27,"text":187,"correct":29},"1.20",{"key":31,"text":189,"correct":22},"1.40",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},898380,"某地2017 年拟建一座年产20 万吨的化工厂，该地区2015 年建成的年产15 万吨相同产品的类似项目实际建设投资为6000 万元。2015 年和2017 年该地区的工程造价指数（定基指数）分别为1.12 和1.15，生产能力指数为0.7，预计该项目建设期的两年内工程造价仍将年均上涨5%。则该项目的静态投资为（ ） 万元。",[194,196,198,200],{"key":20,"text":195,"correct":22},"7147.08",{"key":24,"text":197,"correct":29},"7535.09",{"key":27,"text":199,"correct":22},"7911.84",{"key":31,"text":201,"correct":22},"8307.43",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},898381,"某地拟于2015 年新建一年产60 万吨产品的生产线，该地区2013 年建成的年产50 万吨相同产品的生产线的建设投资额为5000 万元。假定2013 年至2015 年该地区工程造价年均递增5%。则该生产线的建设投资为（ ）万元。",[206,208,210,212],{"key":20,"text":207,"correct":22},"6000",{"key":24,"text":209,"correct":22},"6300",{"key":27,"text":211,"correct":22},"6600",{"key":31,"text":213,"correct":29},"6615",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},898382,"某工程施工合同约定采用价格指数法调整合同价款，各项费用权重及价格如表所示。已知该工程9 月份完成的工程合同价款为3000 万元，则9 月份合同价款调整金额为（ ）万元。",[218,220,222,224],{"key":20,"text":219,"correct":22},"22.5",{"key":24,"text":221,"correct":22},"61.46",{"key":27,"text":223,"correct":22},"75",{"key":31,"text":225,"correct":29},"97.5",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},898383,"某招标工程采用综合评估法评标，报价越低的报价得分越高，评分因素、权重比例、各投标人得分情况见下表。则推荐的第一中标候选人应为（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":29},"甲",{"key":24,"text":233,"correct":22},"乙",{"key":27,"text":235,"correct":22},"丙",{"key":31,"text":237,"correct":22},"甲或乙",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},898384,"某工程合同价格为5000 万元，计划工期是200 天，施工期间因非承包人原因导致工期延误10 天，若同期该公司承揽的所有工程合同总价为2.5 亿元，计划总部管理费为1250 万元，则承包人可以索赔的总部管理费为（ ）万元。",[242,244,246,247],{"key":20,"text":243,"correct":22},"7.5",{"key":24,"text":245,"correct":22},"10",{"key":27,"text":177,"correct":29},{"key":31,"text":248,"correct":22},"15",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},898385,"某工程合同总价为5000 万元，合同工期180 天，材料费占合同总价的60%，材料储备定额天数为25 天。材料供应在途天数为5 天。用公式计算法来求得该工程的预付款为（ ）万元。",[253,255,257,259],{"key":20,"text":254,"correct":29},"417",{"key":24,"text":256,"correct":22},"500",{"key":27,"text":258,"correct":22},"694",{"key":31,"text":260,"correct":22},"833",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},898386,"对某招标工程进行报价分析，在不考虑安全文明施工费的前提下，承包人中标价为1500 万元，招标控制价为1600 万元，设计院编制的施工图预算为1550 万元，承包人认为的合理报价值为1540 万元，则承包人的报价浮动率是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"0.65%",{"key":24,"text":268,"correct":29},"6.25%",{"key":27,"text":270,"correct":22},"93.75%",{"key":31,"text":272,"correct":22},"96.25%",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},898387,"某房屋基坑开挖后，发现局部有软弱下卧层。甲方代表指示乙方配合进行地质复查，共用工10 个工日。地质复查和处理费用为4 万元，同时工期延长3 天，人员窝工15 工日。若用工按100 元\u002F工日、窝工按50元\u002F工日计算，则一方可就该事件索赔的费用是（ ）元。",[277,279,281,283],{"key":20,"text":278,"correct":22},"41250",{"key":24,"text":280,"correct":29},"41750",{"key":27,"text":282,"correct":22},"42500",{"key":31,"text":284,"correct":22},"45250",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},898388,"某工程进度计划网络图上的工作X（在关键线路上）与工作Y（在非关键线路上）同时受到异常恶劣气候条件的彩响，导致X 工作延误10 天，Y 工作延误15 天，该气候条件未对其他工作造成影晌，若Y工作的自由时差为20 天，则承包人可以向发包人索赔的工期是（ ）天。",[289,290,291,293],{"key":20,"text":245,"correct":29},{"key":24,"text":248,"correct":22},{"key":27,"text":292,"correct":22},"25",{"key":31,"text":294,"correct":22},"35",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},898389,"国内生产某台非标准设备需材料费18 万元，加工费2 万元，专用工具费率5%， 设备损失费率10%，包装费0.4 万元，利润率为10%，用成本计算估价法计得该设备的利润是（ ）万元。",[299,301,303,305],{"key":20,"text":300,"correct":22},"2.00",{"key":24,"text":302,"correct":22},"2.10",{"key":27,"text":304,"correct":22},"2.31",{"key":31,"text":306,"correct":29},"2.35",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},898390,"已知国内制造厂生产某非标准设备所用材料费、加工费、辅助材料费、专用工具费、废品损失费共20万元，外购配套件费3 万元，非标准设备设计费1 万元，包装费率1%，利润率为8%，若其他费用不考虑，则该设备的原价为（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"25.82 万元",{"key":24,"text":314,"correct":29},"25.85 万元",{"key":27,"text":316,"correct":22},"26.09 万元",{"key":31,"text":318,"correct":22},"29.09 万元",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},898391,"某进口设备到岸价为1500 万元，银行财务费、外贸手续费合计36 万元，关税300 万元，消费税和增值税税率分别为10%、17%，则该进口设备原价为（ ）万元。",[323,325,327,329],{"key":20,"text":324,"correct":22},"2386.8",{"key":24,"text":326,"correct":29},"2376.0",{"key":27,"text":328,"correct":22},"2362.9",{"key":31,"text":330,"correct":22},"2352.6",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":27,"analysis":33},898392,"某建设项目建筑安装工程费为6000 万元，设备购置费为1000 万元，工程建设其他费用为2000 万元，建设期利息为500 万元。若基本预备费费率为5%，则该建设项目的基本预备费为（ ）万元。",[335,337,339,341],{"key":20,"text":336,"correct":22},"350",{"key":24,"text":338,"correct":22},"400",{"key":27,"text":340,"correct":29},"450",{"key":31,"text":342,"correct":22},"475",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":27,"analysis":33},898393,"某建设项目工程费用5000 万元，工程建设其他费用1000 万元。基本预备费率为8%，年均投资价格上涨率5%，建设期两年，计划每年完成投资50%，则该项目建设期第二年价差预备费应为（ ）万元。",[347,349,351,353],{"key":20,"text":348,"correct":22},"160.02",{"key":24,"text":350,"correct":22},"227.79",{"key":27,"text":352,"correct":29},"246.01",{"key":31,"text":354,"correct":22},"326.02",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":27,"analysis":33},898394,"某建设项目建设期为二年，建设期内第一年贷款400 万元，第二年贷款500 万元，贷款在年内均衡发放，年利率为10%。建设期内只计息不支付，则该项目建设期贷款利息为（ ）万元。",[359,361,363,365],{"key":20,"text":360,"correct":22},"85.0",{"key":24,"text":362,"correct":22},"85.9",{"key":27,"text":364,"correct":29},"87.0",{"key":31,"text":366,"correct":22},"109.0",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":27,"analysis":33},898395,"已知某人工抹灰10 ㎡的基本工作时间为4 小时，辅助工作时间占工序作业时间的5%，准备与结束工作时间、不可避免的中断时回分部占工作日的6%、11%、3%。则该人工抹灰的时间定额为（ ）工日\u002F100 ㎡",[371,373,375,377],{"key":20,"text":372,"correct":22},"6.3",{"key":24,"text":374,"correct":22},"6.56",{"key":27,"text":376,"correct":29},"6.58",{"key":31,"text":378,"correct":22},"6.67",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},898396,"某施工机械设备司机2 人，若年制度工作日为254 天，年工作台班为250 台班，人工日工资单价为80元，则该施工机械的台班人工费为（ ）元\u002F台班。",[383,385,387,389],{"key":20,"text":384,"correct":22},"78.72",{"key":24,"text":386,"correct":22},"81.28",{"key":27,"text":388,"correct":22},"157.44",{"key":31,"text":390,"correct":29},"162.56",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},898397,"某挖土机挖土一次正常循环工作时间为50s，每次循环平均挖土量为0.5m3，机械正常利用系数为0.8，机械幅度差系数为25%，按8 小时工作制考虑，挖土方预算定额的机械台班消耗量为（ ）台班\u002F1000m3。",[395,397,399,401],{"key":20,"text":396,"correct":29},"5.43",{"key":24,"text":398,"correct":22},"7.2",{"key":27,"text":400,"correct":22},"8",{"key":31,"text":402,"correct":22},"8.68",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},898398,"某大型施工机械需配机上司机、机上操作人员各一名，若年制度工作日为250 天，年工作台班为200台班，人工日工资单价均为100 元\u002F工日，则该施工机械的台班人工费为（ ）元\u002F台班。",[407,409,411,413],{"key":20,"text":408,"correct":22},"100",{"key":24,"text":410,"correct":22},"125",{"key":27,"text":412,"correct":22},"200",{"key":31,"text":414,"correct":29},"250",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},898399,"在正常施工条件下，完成10m3混凝土梁浇捣需4 个基本用工，0.5 个辅助用工，0.3 个超运距用工，若人工幅度差系数为10%，则该梁混凝土浇捣预算定额人工消耗量为（ ）工日\u002F10m3。",[419,421,423,425],{"key":20,"text":420,"correct":22},"5.20",{"key":24,"text":422,"correct":22},"5.23",{"key":27,"text":424,"correct":22},"5.25",{"key":31,"text":426,"correct":29},"5.28",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},898400,"编制某分享工程预算定额人工工日消耗量时，已知基本用工，辅助用工、超运距用工分别为20 工日、2 工日、3 工日，人工幅度差系数为10%，则该分项工程单位人工工日消耗量为（ ）工日。",[431,433,435,437],{"key":20,"text":432,"correct":22},"27.0",{"key":24,"text":434,"correct":22},"27.2",{"key":27,"text":436,"correct":22},"27.3",{"key":31,"text":438,"correct":29},"27.5",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":27,"analysis":33},898401,"在国外某地建设一座化工厂，已知设备到达工地的费用 （E）为3000 万美元，该项目的朗格系数（K）及包含的内容如下表所示。则该工厂的间接费用为（ ）万美元。 朗格系数（K）3.003 内容（a）包括基础、设备、油漆及设备安装费E×1.4 （b）包括上述在内和配管工程费（a）×1.1 （c）装置直接费（b）×1.5 （d）包括上述在内和间接费（c）×1.3",[443,445,447,449],{"key":20,"text":444,"correct":22},"9009",{"key":24,"text":446,"correct":22},"6930",{"key":27,"text":448,"correct":29},"2079",{"key":31,"text":450,"correct":22},"1350",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":27,"analysis":33},898402,"某建设项目投资估算中，建设管理费2000 万元，可行性研究费100 万元，勘察设计费5000 万元，引进技术和引进设备其他非400 万元。市政公用设施建设及绿化费2000 万元，专利权使用费200 万元。非专利技术使用费100 万元，生产准备及开办费500 万元，则按形成资产法编制建设投资估算表，计入固定资产其他费、无形资产费用和其他资产费用的金额分别为（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"10000 万元、300 万元、0 万元",{"key":24,"text":458,"correct":22},"9600 万元、700 万元、0 万元",{"key":27,"text":460,"correct":29},"9500 万元、300 万元、500 万元",{"key":31,"text":462,"correct":22},"9100 万元、700 万元、500 万元",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},898403,"某施工现场有塔吊1 台，由施工企业租得，台班单价5000 元台班，租赁费为2000 元\u002F台班。人工工资为80 元\u002F工日，窝工补贴25 元\u002F工日，以人工费和机械费合计为计算基础的综合费率为30%，在施工过程中发生了如下事件：监理人对已经覆盖的隐蔽工程要求重新检查且检查结果合格，配合用工10 工日，塔吊1 台班，为此，施工企业可向业主索赔的费用为（ ）元。",[467,469,471,473],{"key":20,"text":468,"correct":22},"2250",{"key":24,"text":470,"correct":22},"2925",{"key":27,"text":472,"correct":22},"5800",{"key":31,"text":474,"correct":29},"7540",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},898404,"某分项工程招标工程量清单为4000 ㎡，施工中由于设计变更调减为3000 ㎡，该项目招标控制价综合单价为600 元\u002F㎡，投资报价为450\u002F元\u002F㎡。合同约定实际工程量与招标工程量偏差超过±15%时，综合单价以招标控制价位基础调整。若承包人报价浮动率为10%，该分享工程费结算价为（ ）万元。",[479,481,483,485],{"key":20,"text":480,"correct":29},"137.70",{"key":24,"text":482,"correct":22},"155.25",{"key":27,"text":484,"correct":22},"186.30",{"key":31,"text":486,"correct":22},"207.00s",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},898405,"某项目施工合同约定，承包人承租的水泥价格风险幅度为±5%，超出部分采用造价信息法调差，已知投标人投标价格、基准期发布价格为440 元\u002Ft、450 元\u002Ft,2018 年3 月的造价信息发布价为430 元\u002Ft，则该月水泥的实际结算价格为（ ）元\u002Ft。",[491,493,495,497],{"key":20,"text":492,"correct":22},"418",{"key":24,"text":494,"correct":22},"427.5",{"key":27,"text":496,"correct":22},"430",{"key":31,"text":498,"correct":29},"440",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},898406,"某建筑工程钢筋综合用量1000t.施工合同中约定，结算时对钢筋综合价格涨幅±5%以上部分按造价处发布的基准价调整价格差额。承包人投标报价2400 元\u002Ft,投标期、施工期间造价管理机构发布的钢筋综合基准价格为2500 元\u002Ft、2800 元\u002Ft,则需增调钢筋材料费用为（ ）万元。",[503,505,507,509],{"key":20,"text":504,"correct":29},"17.5",{"key":24,"text":506,"correct":22},"28.0",{"key":27,"text":508,"correct":22},"30.0",{"key":31,"text":510,"correct":22},"40.0",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},898407,"某施工合同约定采用价格指数及价格调整公式调整价格差额，调价因素及有关数据见下表。某月完成进度款为1500 万元，则该月应当支付给承包人的价格调整金额为（ ）万元。",[515,517,519,521],{"key":20,"text":516,"correct":22},"-30.3",{"key":24,"text":518,"correct":29},"36.45",{"key":27,"text":520,"correct":22},"112.5",{"key":31,"text":522,"correct":22},"130.5",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},898408,"某施工合同约定人工工资200 元\u002F工日，窝工补贴按人工工资的25%计算，在施工过程中发生了如下事件：①出现异常恶劣天气导致工程停工2 天，人员窝工20 个工日;②因恶劣天气导致场外道路中段，抢修道路用工20 个工日;③几天后，场外停电，停工1 天，人员窝工10 个工日。承包人可向发包人索赔的人工费为（ ）元、",[527,529,531,533],{"key":20,"text":528,"correct":22},"1500",{"key":24,"text":530,"correct":22},"2500",{"key":27,"text":532,"correct":29},"4500",{"key":31,"text":534,"correct":22},"5500",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":27,"analysis":33},898409,"某工业项目及其中I 车间的有关建设费用如下表所示，则I 车间应分摊的生产工艺设计费应为（ ）万元。",[539,541,543,545],{"key":20,"text":540,"correct":22},"112.0",{"key":24,"text":542,"correct":22},"137.1",{"key":27,"text":544,"correct":29},"160.0",{"key":31,"text":546,"correct":22},"186.7",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},898410,"某施工合同中的工程内容由主体工程与附属工程两部分组成，两部分工程的合同额分别为800 万元知200 万元。合同中对误期赔偿费的约定是：每延误一个日历天应赔偿2 万元，且总赔费不超过合同总价款的5%，该工程主体工程按期通过竣工验收，附属工程延误30 日历天后通过竣工验收，则该工程的误期赔偿费为（ ）万元。",[551,553,555,557],{"key":20,"text":552,"correct":22},"1O",{"key":24,"text":554,"correct":29},"12",{"key":27,"text":556,"correct":22},"50",{"key":31,"text":558,"correct":22},"6",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},898411,"某材料原价为300 元\u002Ft，运杂费及运输损耗费台计为50 元\u002Ft，采购及报关费费率3%，则该材料预算单价为（ ）元\u002Ft。",[563,565,567,569],{"key":20,"text":564,"correct":22},"350.0",{"key":24,"text":566,"correct":22},"359.0",{"key":27,"text":568,"correct":29},"360.5",{"key":31,"text":570,"correct":22},"360.8",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},898412,"采用成本计算估价法计算国产非标准设备原价时，包装费的计取基数不包括该设备的（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"材料费",{"key":24,"text":578,"correct":22},"加工费",{"key":27,"text":580,"correct":22},"外购配套件费",{"key":31,"text":582,"correct":29},"设计费",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":24,"analysis":33},898413,"根据我国现行工程造价构成，属于固定资产投资中积极部分的是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"建筑安装工程费",{"key":24,"text":590,"correct":29},"设备及工、器具购置费",{"key":27,"text":592,"correct":22},"建设用地费",{"key":31,"text":594,"correct":22},"可行性研究费",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":27,"analysis":33},898414,"关于进口设备到岸价的构成及计算，下列公式中正确的是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":22},"到岸价=离岸价+运输保险费",{"key":24,"text":602,"correct":22},"到岸价=离岸价+进口从属费",{"key":27,"text":604,"correct":29},"到岸价=运费在内价+运输保险费",{"key":31,"text":606,"correct":22},"到岸价=运费在内费+进口从属费",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":31,"analysis":33},898415,"计算非标准设备原价时，下列表述中正确的是（ ）。",[611,613,615,617],{"key":20,"text":612,"correct":22},"专用工具费=（材料费+加工费）×专用工具费率",{"key":24,"text":614,"correct":22},"加工费=设备总重量×（1+加工耗损系数）×设备每吨加工费",{"key":27,"text":616,"correct":22},"包装费的计算基数中不应包含废品损失费",{"key":31,"text":618,"correct":29},"利润的计算基数中不应包含外购配套件费",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]