[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":624},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,10,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,277,289,301,313,325,337,349,361,373,385,397,409,421,433,445,457,469,481,493,505,517,529,541,553,565,577,589,601,612],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},898295,1,"单选题","“工程造价信息应针对不同层次管理者的要求进行适当加工，针对不同管理层提供不同要求和浓缩程度的信息。”这体现了工程造价信息管理应遵循的（ ）原则。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","标准化",false,{"key":24,"text":25,"correct":26},"B","有效性",true,{"key":28,"text":29,"correct":22},"C","定量化",{"key":31,"text":32,"correct":22},"D","高效处理","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},898296,"某工程在建设期初和建设期第一年末实际发生的设备、工器具购置情况如下表所示。与建设期初相比，第一年末的设备、工器具价格指数为（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"82.49",{"key":24,"text":41,"correct":22},"121.19",{"key":28,"text":43,"correct":22},"82.5",{"key":31,"text":45,"correct":26},"112.60",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},898297,"可行性研究阶段投资估算的精确度的要求为：误差控制在（ ）%以内。",[50,52,54,56],{"key":20,"text":51,"correct":22},"5",{"key":24,"text":53,"correct":26},"10",{"key":28,"text":55,"correct":22},"15",{"key":31,"text":57,"correct":22},"20",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},898298,"某地2012 年拟建年产30 万吨化工产品项目。依据调查，某生产相同产品的已建成项目，年产量为10 万吨，建设投资为12000 万元。若生产能力指数为0.9，综合调整系数为1.15，则该拟建项目的建设投资是（ ）万元。",[62,64,66,68],{"key":20,"text":63,"correct":22},"28047",{"key":24,"text":65,"correct":22},"36578",{"key":28,"text":67,"correct":26},"37093",{"key":31,"text":69,"correct":22},"37260",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},898299,"关于项目投资估算的作用，下列说法中正确的是（ ）",[74,76,78,80],{"key":20,"text":75,"correct":22},"项目建议书阶段的投资估算，是确定建设投资最高限额的依据",{"key":24,"text":77,"correct":22},"可行性研究阶段的投资估算，是项目投资决策的重要依据，不得突破",{"key":28,"text":79,"correct":22},"投资估算不能作为制定建设货款计划的依据",{"key":31,"text":81,"correct":26},"投资估算是核算建设项目固定资产需要数的重要依据",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},898302,"单位工程概算按其工作性质可分为单位建设工程概算和单位设备及安装工程概算两类，下列属于单位设备及安装工程概算的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"通风、空调工程概算",{"key":24,"text":89,"correct":26},"工器具及生产家具购置费概算",{"key":28,"text":91,"correct":22},"电气、照明工程概算",{"key":31,"text":93,"correct":22},"弱电工程概算",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},898303,"某地拟建一幢建筑面积为 2500m2 办公楼。已知建筑面积为 2700m2 的类似工程预算成本为 216 万元，其人、材、机、企业管理费占预算成本的比重分别为 20%、50%、10%、20%。拟建工程和类似工程地区的人工费、材料费、施工机具使用费、企业管理费之间的差异系数分别是 1.1、1.2、1.3、1.15，综合费率为 4%，则利用类似工程预算法编制该拟建工程概算造价为（ ）万元。",[98,100,102,104],{"key":20,"text":99,"correct":26},"245.44",{"key":24,"text":101,"correct":22},"252.2",{"key":28,"text":103,"correct":22},"287.4",{"key":31,"text":105,"correct":22},"302.8",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},898305,"关于工程设计对造价的影响，下列说法中正确的有（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"建筑周长系数越大，设计越经济",{"key":24,"text":113,"correct":26},"建筑物尺寸的增加，一般会引起单位面积造价的降低",{"key":28,"text":115,"correct":22},"单跨厂房跨度不变时，层数越多越经济",{"key":31,"text":117,"correct":22},"多跨厂房柱间距不变时，跨度越大造价越低",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},898306,"当初步设计深度较深、有详细的设备清单时，最能精确地编制设备安装工程概算的方法是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"预算单价法",{"key":24,"text":125,"correct":22},"扩大单价法",{"key":28,"text":127,"correct":22},"设备价值百分比法",{"key":31,"text":129,"correct":22},"综合吨位指标法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},898307,"当采用概算指标法编制建筑工程概算时，拟建工程结构特征与概算指标有局部差异时的调整，调整公式中的单价通常是（ ）",[134,136,138,140],{"key":20,"text":135,"correct":22},"工料单价",{"key":24,"text":137,"correct":22},"全费用单价",{"key":28,"text":139,"correct":26},"综合单价",{"key":31,"text":141,"correct":22},"成本单价",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},898308,"用全费用综合单价法编制单位工程施工图预算时，下列说法中正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"单位工程施工图预算包括建筑工程费和安装工程费",{"key":24,"text":149,"correct":22},"全费用综合单价包括人工费、材料费、施工机具使用费、管理费和利润",{"key":28,"text":151,"correct":22},"综合计取的措施项目费与分部分项工程费的计算方法相同",{"key":31,"text":153,"correct":26},"建筑安装工程施工图预算费为分部分项工程费与措施项目费之和",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},898309,"建设工程三级预算编制中的总预算由（ ）组成。",[158,160,162,164],{"key":20,"text":159,"correct":22},"综合预算和工程建设其他费、预备费",{"key":24,"text":161,"correct":22},"预备费、建设期利息及铺底流动资金",{"key":28,"text":163,"correct":22},"综合预算和工程建设其他费、铺底流动资金",{"key":31,"text":165,"correct":26},"综合预算和工程建设其他费、预备费、建设期利息及铺底流动资金",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},898310,"采用工料单价法编制单位工程预算时，在进行工料分析前一个步骤是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"计算人、材、机费用",{"key":24,"text":173,"correct":22},"计算企业管理费、利润、规费、税金等",{"key":28,"text":175,"correct":22},"复核工程量的准确性",{"key":31,"text":177,"correct":26},"计算措施项目人材机费用",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},898311,"用全费用综合单价法编制施工图预算，下列建筑安装工程施工图预算费计算式正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"Σ（子目工程量×子目工料单价）+企业管理费+利润+规费+税金",{"key":24,"text":185,"correct":22},"Σ（分部分项工程量×分部分项工程全费用综合单价）",{"key":28,"text":187,"correct":26},"分部分项工程费+措施项目费",{"key":31,"text":189,"correct":22},"分部分项工程费+措施项目费+其他项目+规费+税金",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},898312,"工料单价法编制施工图预算的工作有：①计算主材料②套用工料单价③计算措施项目人材机费用④划分工程项目和计算工程量⑤进行工料分析，下列工作排序正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"④②⑤①③",{"key":24,"text":197,"correct":22},"④⑤①②③",{"key":28,"text":199,"correct":22},"②④⑤①③",{"key":31,"text":201,"correct":26},"④②③⑤①",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},898317,"下列属于投标人须知中所包括的内容有（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"评标办法",{"key":24,"text":209,"correct":22},"工程量清单",{"key":28,"text":211,"correct":22},"技术标准和要求",{"key":31,"text":213,"correct":26},"合同授予",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},898318,"关于招标控制价，下列说法中正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"招标人不得拒绝高于招标控制价的投标报价",{"key":24,"text":221,"correct":22},"利润应按政府有关规定进行计算",{"key":28,"text":223,"correct":22},"招标控制价超过批准概算3%时，应报原概算审批部门审核",{"key":31,"text":225,"correct":26},"经复查的招标控制价与原招标控制价误差>±3%的应责成招标人改正",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},898319,"招标控制价综合单价的组价包括如下工作：①根据政策规定或造价信息确定工料机单价；②根据工程所在地的定额规定计算工程量；③将定额项目的合价除以清单项目的工程量；④根据费率和利率计算出组价定额项目的合价，则正确的工作顺序是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"①④②③",{"key":24,"text":233,"correct":22},"①③②④",{"key":28,"text":235,"correct":22},"②①③④",{"key":31,"text":237,"correct":26},"②①④③",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},898320,"在招标工程量清单编制的准备工作中，初步研究阶段主要完成的工程内容包括（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"现场踏勘",{"key":24,"text":245,"correct":22},"拟定常规的施工组织设计",{"key":28,"text":247,"correct":26},"确定工程量清单编制的范围及需要设定的暂估价",{"key":31,"text":249,"correct":22},"估算整体工程量",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},898324,"下列情形中，不属于投标人串通投标的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"投标人A 与B 的项目经理为同一人",{"key":24,"text":257,"correct":22},"投标人C 与D 的投标文件相互错装",{"key":28,"text":259,"correct":26},"投标人E 和F 在同一时刻提前递交投标文件",{"key":31,"text":261,"correct":22},"投标人G 与H 作为暗标的技术标由同一人编制",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},898326,"相较于在劳务市场招募零散的劳动力，承包人选择成建制劳务公司的劳务具有（ ）的特点。",[266,268,270,272,274],{"key":20,"text":267,"correct":22},"价格高，管理强度高",{"key":24,"text":269,"correct":26},"价格高，管理强度低",{"key":28,"text":271,"correct":22},"价格低，管理强度低",{"key":31,"text":273,"correct":22},"价格低，管理强度高",{"key":275,"text":276,"correct":22},"E","工程结算",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":28,"analysis":33},898327,"对投标报价校核，审查全部报价数据计算的正确性，分析报价构成的合理性等工作属于投标文件的（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":22},"形式评审标准",{"key":24,"text":284,"correct":22},"资格评审标准",{"key":28,"text":286,"correct":26},"响应评审标准",{"key":31,"text":288,"correct":22},"施工组织设计评审标准",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":31,"analysis":33},898328,"对于投标文件存在的下列偏差，评标委员会应书面要求投标人在评标结束前予以补正的情形是（ ）。",[293,295,297,299],{"key":20,"text":294,"correct":22},"未按招标文件规定的格式填写，内容不全的",{"key":24,"text":296,"correct":22},"所提供的投标担保有瑕疵的",{"key":28,"text":298,"correct":22},"投标文件未经投标单位盖章和单位负责人签字",{"key":31,"text":300,"correct":26},"实质上响应招标文件要求但个别地方存在漏项的细微偏差",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":24,"analysis":33},898329,"招标工程未进行资格预审，评审委员会按规定对投标人安全生产许可证的有效性进行的评审属于（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"形式评审",{"key":24,"text":308,"correct":26},"资格评审",{"key":28,"text":310,"correct":22},"响应性评审",{"key":31,"text":312,"correct":22},"商务评审",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":31,"analysis":33},898331,"关于合同价款与合同类型，下列说法正确的是（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":22},"中标人应当自中标通知书收到之日起30 天内与招标人订立书面合同",{"key":24,"text":320,"correct":22},"工期特别近、技术特别复杂的项目应采用总价合同",{"key":28,"text":322,"correct":22},"实行工程量清单计价的工程，应采用单价合同",{"key":31,"text":324,"correct":26},"工程总承包招标的投标有效期为120 天",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},898332,"下列不属于工程总承包综合评估法中详细评审所包括的内容有（ ）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"承包人实施方案评分标准",{"key":24,"text":332,"correct":26},"响应性评审标准",{"key":28,"text":334,"correct":22},"承包人建议书评分标准",{"key":31,"text":336,"correct":22},"资信业绩评分标准",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":28,"analysis":33},898335,"工程总承包企业投标报价决策时应准确估计成本:其成本费用应由（ ）等组成。",[341,343,345,347],{"key":20,"text":342,"correct":22},"勘察设计费用、采购费用、施工费用、总部管理费",{"key":24,"text":344,"correct":22},"勘察设计费用、分包合同费用、施工费用、利润",{"key":28,"text":346,"correct":26},"公司本部费用、施工费用、直接设备材料费用、分包合同费用",{"key":31,"text":348,"correct":22},"公司本部费用、施工费用、直接设备材料费用、风险费用",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":28,"analysis":33},898336,"国际竞争性招标投标过程中只对标书的报价和其他因素进行评比不对投标人资格进行评审的工作是（ ）。",[353,355,357,359],{"key":20,"text":354,"correct":22},"清标",{"key":24,"text":356,"correct":22},"审标",{"key":28,"text":358,"correct":26},"评标",{"key":31,"text":360,"correct":22},"定标",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":20,"analysis":33},898337,"根据《建设工程工程量清单计价规范》（GB 50500-2013），关于工程竣工结算的计价原则，下列说法正确的是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":26},"计日工按发包人实际签证确认的事项计算",{"key":24,"text":368,"correct":22},"总承包服务费依据合同约定金额计算，不得调整",{"key":28,"text":370,"correct":22},"暂列金额应减去工程价款调整金额计算，余额归承包人",{"key":31,"text":372,"correct":22},"规费和税金应按照地方建设主管部门的规定计算",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":28,"analysis":33},898339,"某工程施工合同对于工程款付款时间约定不明，工程尚未交付，工程价款也未结算，现承包人起诉，发包人工程欠款利息应从（ ）之日计付。",[377,379,381,383],{"key":20,"text":378,"correct":22},"工程计划交付",{"key":24,"text":380,"correct":22},"提交竣工结算文件",{"key":28,"text":382,"correct":26},"当事人起诉",{"key":31,"text":384,"correct":22},"监理工程师暂定付款",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},898341,"施工合同履行期间，下列不属于工程计量范围的是（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":22},"工程变更修改的工程量清单内容",{"key":24,"text":392,"correct":22},"合同文件中规定的各种费用支付项目",{"key":28,"text":394,"correct":22},"暂列金额中的专业工程",{"key":31,"text":396,"correct":26},"擅自超出施工图纸施工的工程",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":28,"analysis":33},898342,"关于施工合同履行期间的期中支付，下列说法中正确的是（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"双方对工程计量结果的争议，不影响发包人对已完工工程的期中支付",{"key":24,"text":404,"correct":22},"对已签发支付证书中的计算错误，发包人不得再予修正",{"key":28,"text":406,"correct":26},"进度款支付申请中应包括累计已完成的合同价款",{"key":31,"text":408,"correct":22},"本周期实际支付的合同额为本期完成的合同价款合计",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},898343,"已知某工程承包合同价款总额为8000 万元，其主要材料及构件所占比重为50%，预付款总金额为工程价款总额的25%，则预付款起扣点是（ ）万元。",[413,415,417,419],{"key":20,"text":414,"correct":22},"2000",{"key":24,"text":416,"correct":22},"2400",{"key":28,"text":418,"correct":22},"3600",{"key":31,"text":420,"correct":26},"4000",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},898344,"关于办理有质量争议工程的竣工结算，下列说法中错误的是（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"已实际投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":24,"text":428,"correct":26},"已竣工未投入使用工程的质量争议按工程保修合同执行，竣工结算按合同约定办理",{"key":28,"text":430,"correct":22},"停工、停建工程的质量争议可在执行工程质量监督机构处理决定后办理竣工结算",{"key":31,"text":432,"correct":22},"已竣工未验收并且未实际投入使用，其无质量争议部分的工程，竣工结算按合同约定办理",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},898346,"根据《建设工程工程量清单计价规范》(GB50500-2013)，关于工程预付款的支付和扣回，下列说法中正确的是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"预付款的比例原则上不低于合同金额的10%，不高于合同金额的20%",{"key":24,"text":440,"correct":22},"承发包双方签订合同后，发包人最晚应在开工日期前14 天内支付预付款",{"key":28,"text":442,"correct":22},"在发出要求预付通知的14 天后，承包人仍未收到预付款时，可以停止施工",{"key":31,"text":444,"correct":26},"发包人应在预付款扣完后14 天内一次将全额预付款保函退还给承包人",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":31,"analysis":33},898347,"在竣工结算中，由于不可抗力解除合同的，发包人除应向承包人支付合同解除之日前已完成工程但尚未支付的合同价款，还应支付的金额不包括（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"已实施或部分实施的措施项目应付价款",{"key":24,"text":452,"correct":22},"承包人为合同工程合理订购且已交付的材料和工程设备货款",{"key":28,"text":454,"correct":22},"承包人撤离现场所需的员工遣送费",{"key":31,"text":456,"correct":26},"承包人为完成合同工程而预期开支的任何合理费用，且该项费用已包括在本款其他各项支付之内",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":28,"analysis":33},898348,"根据《建设项目工程总承包合同示范文本》（GF-2011-0126），下列属于施工变更的是（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"对区域内标准标高的调整",{"key":24,"text":464,"correct":22},"对备品备件采购数量的增减",{"key":28,"text":466,"correct":26},"发包人对竣工试验合格的项目重新进行竣工试验",{"key":31,"text":468,"correct":22},"因发包人原因暂停工程超过45 天，调减受影响的部分工程",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":31,"analysis":33},898349,"在FIDIC 合同条件中，工程师确认用于永久工程的材料和设备符合预支条件，在确定其实际费用后，其中支付证书中应增加该费用的（ ）作为工程材料和预备预支款。",[473,475,477,479],{"key":20,"text":474,"correct":22},"50%",{"key":24,"text":476,"correct":22},"60%",{"key":28,"text":478,"correct":22},"70%",{"key":31,"text":480,"correct":26},"80%",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},898350,"关于工程总承包合同价款的结算，下列说法不正确的有（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":26},"合同约定按月工程进度申请付款和付款时，发包人在收到承包人提交的每月付款申请报告之日起的14天内审查并支付",{"key":24,"text":488,"correct":22},"发包人延误支付进度款15 天以上，承包人有权向发包人发出要求付款的通知",{"key":28,"text":490,"correct":22},"发包人延误支付进度款达60 天以上，并影响工程实施的，承包人有权解除合同",{"key":31,"text":492,"correct":22},"发包人应在收到承包人提交的最终竣工结算资料后30 日内，结清竣工结算的款项",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},898351,"根据《建设项目工程总承包合同示范文本（实行）》（GF-2011-0216），下列变更事项，属于采购变更的是（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"对设备规格和数量的调整",{"key":24,"text":500,"correct":26},"改变检查、检验、检测、试验地点",{"key":28,"text":502,"correct":22},"重新进行竣工验收",{"key":31,"text":504,"correct":22},"对配套工程系统的工艺调整",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},898352,"根据我国现行合同条件，关于工程变更价款调整的说法中，正确的是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"工程变更引起分部分项工程项目发生变化的，已标价工程量清单中没有适用、但有类似变更项目的，可由承包人提出，报发包人确认后调整",{"key":24,"text":512,"correct":22},"工程变更引起措施项目发生变化的，承包人不需将事先拟实施的方案提交给发包人确认",{"key":28,"text":514,"correct":22},"已标价工程量清单中有适用于变更工程项目的，且工程变更导致的该清单项目的工程数量变化不足15%时，工程变更的综合单价可由发承包双方协商调整",{"key":31,"text":516,"correct":26},"因发包人原因提出的删减工程，致使承包人发生的费用未包含在已完工程中的，承包人有权提出并得到费用及利润补偿",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},898353,"某分项工程招标工程量清单数量为4000m2，施工中由于设计变更调减为3000m2，该项目招标控制价综合单价为600 元\u002Fm2，投标报价为450 元\u002Fm2。合同约定实际工程量与招标工程量偏差超过±15%时，综合单价以招标控制价为基础调整。若承包人报价浮动率为10%，该分项工程费结算价为（ ）万元。",[521,523,525,527],{"key":20,"text":522,"correct":26},"137.70",{"key":24,"text":524,"correct":22},"155.25",{"key":28,"text":526,"correct":22},"186.30",{"key":31,"text":528,"correct":22},"207.00",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":28,"analysis":33},898354,"关于合同价款调整，下列说法正确的有（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":22},"当应予计算的实际工程量与招标工程量清单出现偏差（不包括因工程变更等原因导致的工程量偏差）超过15%时，对综合单价进行调整",{"key":24,"text":536,"correct":22},"发包人压缩的工期天数不得超过定额工期的25%",{"key":28,"text":538,"correct":26},"因为不可抗力造成承包人的施工机械设备损坏及停工损失，由承包人承担",{"key":31,"text":540,"correct":22},"任一计日工结束，已标价工程量清单中没有该类计日工单价的，由承包人提出，报发包人确认",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},898355,"某工程施工合同约定采用价格指数法调整合同价款，各项费用权重及价格如下表所示。已知该工程9 月份完成的工程合同价款为3000 万元，则9 月份合同价款调整金额为（ ）万元。",[545,547,549,551],{"key":20,"text":546,"correct":22},"22.5",{"key":24,"text":548,"correct":22},"61.46",{"key":28,"text":550,"correct":22},"75",{"key":31,"text":552,"correct":26},"97.5",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},898356,"采用造价信息调整价格差额，对材料和工程设备价格的调整，下列说法正确的有（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"如果承包人投标报价中材料单价高于基准单价，工程施工期间材料单价跌幅以材料单价为基础超过合同约定的风险幅度值时，其超过部分按实调整",{"key":24,"text":560,"correct":26},"如果承包人投标报价中材料单价低于基准单价，工程施工期间材料单价涨幅以基准单价为基础超过合同约定的风险幅度值时，其超过部分按实调整",{"key":28,"text":562,"correct":22},"如果承包人投标报价中材料单价低于基准单价，工程施工期间材料单价跌幅以基准单价为基础超过合同约定的风险幅度值时，其超过部分按实调整",{"key":31,"text":564,"correct":22},"如果承包人投标报价中材料单价高于基准单价，工程施工期间材料单价涨幅以基准单价为基础超过合同约定的风险幅度值时，其超过部分按实调整",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},898357,"为了合理划分发承包双方的合同风险，施工合同中应当约定一个基准日。对于实行招标的建设工程，一般以（ ）前的第28 天作为基准日。",[569,571,573,575],{"key":20,"text":570,"correct":26},"投标截止时间",{"key":24,"text":572,"correct":22},"招标截止日",{"key":28,"text":574,"correct":22},"中标通知书发出",{"key":31,"text":576,"correct":22},"合同签订",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},898359,"某项目投标截止日期为2016 年8 月1 日，通过评标确定中标人后，签订的合同总价为800 万元。合同约定期末一次付清。约定最终结清的时间为2018 年7 月30 日。已知2016 年7 月份的价格指数为102.3%，2016 年8月的价格指数为104.2%，2018 年6 月的价格指数为106.7%，2018 年7 月份的价格指数为111.2%。则此项目最终结算款为（ ）万元。",[581,583,585,587],{"key":20,"text":582,"correct":26},"834.41",{"key":24,"text":584,"correct":22},"864.26",{"key":28,"text":586,"correct":22},"837.31",{"key":31,"text":588,"correct":22},"834.40",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},898360,"采用价格指数调整价格差额，价格指数应首先采用工程造价管理机构提供的价格指数，缺乏上述价格指数时，可（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"采用市场调查的当前价格计算",{"key":24,"text":596,"correct":22},"按照合同约定的价格指数进行调整",{"key":28,"text":598,"correct":22},"由双方协商约定价格调整方法",{"key":31,"text":600,"correct":26},"采用工程造价管理机构提供的价格代替",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":20,"analysis":33},898363,"某建设工程项目关键线路上的A 工作由于非承包商的原因推迟了2 天，还有一个非关键线路上的B 工作也是由于非承包商的原因推迟了3 天，B 工作的总时差为4 天，则承包商可以索赔的工期是（ ）天。",[605,607,608,610],{"key":20,"text":606,"correct":26},"2",{"key":24,"text":51,"correct":22},{"key":28,"text":609,"correct":22},"7",{"key":31,"text":611,"correct":22},"8",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":24,"analysis":33},898365,"建设项目竣工财务决算应编制基本建设项目概况表，下列选项中应计入基本建设项目概况表“非经营项目转出投资”的是（ ）。",[616,618,620,622],{"key":20,"text":617,"correct":22},"水土保持、城市绿化费用",{"key":24,"text":619,"correct":26},"产权不归属本单位的专用道路建设费",{"key":28,"text":621,"correct":22},"报废工程建设费",{"key":31,"text":623,"correct":22},"产权归本单位的地下管道建设费",[625,628,631,634,637,640],{"id":15,"name":626,"category":7,"favorite":627},"领导干部任职前廉政法规知识测试题",92,{"id":629,"name":630,"category":7,"favorite":15},595,"建筑结构与设备",{"id":632,"name":633,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":635,"name":636,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":638,"name":639,"category":7,"favorite":8},534,"BIM工程师",{"id":641,"name":639,"category":7,"favorite":8},535]