[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-582-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},582,"建设工程计价","建筑工程",0,1,50,2160,[13,33,45,55,67,79,91,103,115,127,139,151,163,175,187,199,211,223,235,243,255,267,279,291,303,315,327,339,351,363,375,387,399,411,423,433,445,457,467,478,490,502,514,526,538,550,562,574,586,598],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},897768,"单选题","(2014年)根据世界银行对工程项目建设成本的规定，下列费用应计入项目间接建设成本的是（）",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","临时公告设施及场地的维持费",false,{"key":23,"text":24,"correct":21},"B","建筑保险和债卷费",{"key":26,"text":27,"correct":28},"C","开工试车费",true,{"key":30,"text":31,"correct":21},"D","土地征购费","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":23,"analysis":32},897769,"(2013年)国外建筑工程造价构成中，反映工程造价估算日期至工程竣工日期之前，工程各个主要组成部分的人工、材料和设备等未知价格增长部分是()。",[37,39,41,43],{"key":19,"text":38,"correct":21},"直接建设成本",{"key":23,"text":40,"correct":28},"建设成本上升费",{"key":26,"text":42,"correct":21},"不可预见准备金",{"key":30,"text":44,"correct":21},"未明确项目准备金",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":26,"analysis":32},897770,"(2015年)根据世界银行对建设工程造价构成的规定，只能作为一种储备可能不动用的费用是( )。",[49,50,52,53],{"key":19,"text":44,"correct":21},{"key":23,"text":51,"correct":21},"基本预备费",{"key":26,"text":42,"correct":28},{"key":30,"text":54,"correct":21},"建设成本上升费用",{"id":56,"libraryId":5,"type":9,"typeLabel":15,"stem":57,"options":58,"answer":26,"analysis":32},897771,"(2016年)关于我国建设项目投资，以下说法正确的是()。",[59,61,63,65],{"key":19,"text":60,"correct":21},"非生产性建设项目总投资由固定资产投资和铺底流动资金组成",{"key":23,"text":62,"correct":21},"生产性建设项目总投资由工程费用、工程建设其他费用和预备费三部分组成",{"key":26,"text":64,"correct":28},"建设投资是为了完成工程项目建设，在建设期内投入且形成现金流出的全部费用",{"key":30,"text":66,"correct":21},"建设投资由固定资产投资和建设期利息组成",{"id":68,"libraryId":5,"type":9,"typeLabel":15,"stem":69,"options":70,"answer":30,"analysis":32},897772,"（2017 年考题）根据现行建设项目工程造价构成的相关规定，工程造价是指（ ）。",[71,73,75,77],{"key":19,"text":72,"correct":21},"为完成工程项目建造，生产性设备及配合工程安装设备的费用",{"key":23,"text":74,"correct":21},"建设期内直接用于工程建造、设备购置及其安装的建设投资",{"key":26,"text":76,"correct":21},"为完成工程项目建设，在建设期内投入且形成现金流出的全部费用",{"key":30,"text":78,"correct":28},"在建设期内预计或实际支出的建设费用",{"id":80,"libraryId":5,"type":9,"typeLabel":15,"stem":81,"options":82,"answer":23,"analysis":32},897773,"(2018年)根据现行建设项目投资构成相关规定，固定资产投资应与（ ）相对应。",[83,85,87,89],{"key":19,"text":84,"correct":21},"工程费用+工程建设其他费用",{"key":23,"text":86,"correct":28},"建设投资+建设期利息",{"key":26,"text":88,"correct":21},"建设安装工程费+设备及工器具购置费",{"key":30,"text":90,"correct":21},"建设项目总投资",{"id":92,"libraryId":5,"type":9,"typeLabel":15,"stem":93,"options":94,"answer":23,"analysis":32},897774,"（2019年真题）某项目根据《建设项目投资估算编审规程》( CECA\u002FGC 1-2015)，采用概算法编制的估算中，工程费用为8000万元，基本预备费用为880万元，价差预备费为120万元，工程建设其他费800万，建设期利息为200万元，流动资金为100万元，则该项目的建设投资为（）万元。",[95,97,99,101],{"key":19,"text":96,"correct":21},"9680",{"key":23,"text":98,"correct":28},"9800",{"key":26,"text":100,"correct":21},"10000",{"key":30,"text":102,"correct":21},"10100",{"id":104,"libraryId":5,"type":9,"typeLabel":15,"stem":105,"options":106,"answer":26,"analysis":32},897775,"（2019年真题）根据我国现行建设工程总投资及工程造价的构成，下列资金在数额上和工程造价相等的是（ ）",[107,109,111,113],{"key":19,"text":108,"correct":21},"固定资产投资+流动资金",{"key":23,"text":110,"correct":21},"固定资产投资+铺底流动资金",{"key":26,"text":112,"correct":28},"固定资产投资",{"key":30,"text":114,"correct":21},"建设投资",{"id":116,"libraryId":5,"type":9,"typeLabel":15,"stem":117,"options":118,"answer":23,"analysis":32},897777,"(2015年)关于进口设备外贸手续费的计算，下列公式中正确的是( )。",[119,121,123,125],{"key":19,"text":120,"correct":21},"外贸手续费=FOB*人民币外汇汇率x外贸手续费率",{"key":23,"text":122,"correct":28},"外贸手续费=CIFx人民币外汇汇率x外贸手续费率",{"key":26,"text":124,"correct":21},"外贸手续费=(FOB*人名币外汇汇率)\u002F(1-外贸手续费率)*外贸手续费率",{"key":30,"text":126,"correct":21},"外贸手续费=(CIF*人名币外汇汇率)\u002F(1-外贸手续费率)*外贸手续费率",{"id":128,"libraryId":5,"type":9,"typeLabel":15,"stem":129,"options":130,"answer":26,"analysis":32},897778,"(2014年)关于设备及工器具购置费用，下列说法中正确的是（）。",[131,133,135,137],{"key":19,"text":132,"correct":21},"它是由设备购置费和工具、器具及生活家居购置费组成。",{"key":23,"text":134,"correct":21},"它是固定资产投资中的消极部分",{"key":26,"text":136,"correct":28},"在工业建筑中，它占工程造价比重的增大意味着生产技术的进步",{"key":30,"text":138,"correct":21},"在民用建筑中，它占工程造价比重的增大意味着资本有机构成的提高",{"id":140,"libraryId":5,"type":9,"typeLabel":15,"stem":141,"options":142,"answer":23,"analysis":32},897779,"(2014年)已知国内制造厂某非标准设备所用材料费、加工费、辅助材料费、专用工具费、废品损失费共20万元，外购配置费3万元，非标准设备设计费1万元，包装费率1%，利率为8%，若其他费用不考虑，则该设备的原价为（）",[143,145,147,149],{"key":19,"text":144,"correct":21},"25.82万元",{"key":23,"text":146,"correct":28},"25.85万元",{"key":26,"text":148,"correct":21},"26.09万元",{"key":30,"text":150,"correct":21},"29.09万元",{"id":152,"libraryId":5,"type":9,"typeLabel":15,"stem":153,"options":154,"answer":30,"analysis":32},897780,"(2015年)采用成本计算估价法计算非标准设备租赁时，下列表述中正确的是( )。",[155,157,159,161],{"key":19,"text":156,"correct":21},"专用工具费=（材料费+加工费）×专用工具费率",{"key":23,"text":158,"correct":21},"加工费=设备总重量×（1+加工损耗系数）×设备每吨加工费",{"key":26,"text":160,"correct":21},"包装费的计算基数中不应包含废品损失费",{"key":30,"text":162,"correct":28},"利润的计算基数中不应包含外购配套件费",{"id":164,"libraryId":5,"type":9,"typeLabel":15,"stem":165,"options":166,"answer":30,"analysis":32},897781,"(2015年)某批进口设备离岸价格为1000万元人民币，国际运费为100万元人民币，运输保险费费率为1%。则该批设备的关税完税价格税为( )万元人民币。",[167,169,171,173],{"key":19,"text":168,"correct":21},"1100.00",{"key":23,"text":170,"correct":21},"1110.00",{"key":26,"text":172,"correct":21},"1111.00",{"key":30,"text":174,"correct":28},"1111.11",{"id":176,"libraryId":5,"type":9,"typeLabel":15,"stem":177,"options":178,"answer":26,"analysis":32},897782,"(2016年)已知生产某非标准设备所需材料费、加工费、辅助材料费、专用工器具费合计为30万元，废品损失率为10%，外购配套件费为5万元，包装费率为2%，利润率为10%。用成本估算发计算该设备的利润值为()万元。",[179,181,183,185],{"key":19,"text":180,"correct":21},"3.366",{"key":23,"text":182,"correct":21},"3.370",{"key":26,"text":184,"correct":28},"3.376",{"key":30,"text":186,"correct":21},"3.876",{"id":188,"libraryId":5,"type":9,"typeLabel":15,"stem":189,"options":190,"answer":23,"analysis":32},897783,"(2016年)进口设备的原价是指进口设备的()。",[191,193,195,197],{"key":19,"text":192,"correct":21},"到岸价",{"key":23,"text":194,"correct":28},"抵岸价",{"key":26,"text":196,"correct":21},"离岸价",{"key":30,"text":198,"correct":21},"运费在内价",{"id":200,"libraryId":5,"type":9,"typeLabel":15,"stem":201,"options":202,"answer":19,"analysis":32},897784,"(2013年)下列费用项目中，属于工器具及生产家具购置费计算内容的是()。",[203,205,207,209],{"key":19,"text":204,"correct":28},"未达到固定资产标准的设备购置费",{"key":23,"text":206,"correct":21},"达到固定资产标准的设备购置费",{"key":26,"text":208,"correct":21},"引进设备时备品备件的测绘费",{"key":30,"text":210,"correct":21},"引进设备的专利使用费",{"id":212,"libraryId":5,"type":9,"typeLabel":15,"stem":213,"options":214,"answer":30,"analysis":32},897785,"(2013年)某工程采购一台国产非标准设备，制造厂生产该设备的材料费、加工费和辅助材料费合计20万元，专用工具费率为2%，废品损失率为8%，利润率为10%，增值税率为17%。假设不在发生其他费用，则该设备的销项增值税为()。",[215,217,219,221],{"key":19,"text":216,"correct":21},"4.08",{"key":23,"text":218,"correct":21},"4.09",{"key":26,"text":220,"correct":21},"4.11",{"key":30,"text":222,"correct":28},"4.12",{"id":224,"libraryId":5,"type":9,"typeLabel":15,"stem":225,"options":226,"answer":30,"analysis":32},897786,"(2018年)国内生产某台非标准设备需材料费18 万元，加工费2 万元，专用工具费率5%，废品损失费率10%，包装费0.4 万元，利润率为10%，用成本计算估价法计得该设备的利润是（ ）万元。",[227,229,231,233],{"key":19,"text":228,"correct":21},"2.00",{"key":23,"text":230,"correct":21},"2.10",{"key":26,"text":232,"correct":21},"2.31",{"key":30,"text":234,"correct":28},"2.35",{"id":236,"libraryId":5,"type":9,"typeLabel":15,"stem":237,"options":238,"answer":19,"analysis":32},897787,"(2018年)国际贸易双方的约定费用划分与风险转移均以货物在装运港被装上指定船只时为分界点。该种交易价格被称为（ ）。",[239,240,241,242],{"key":19,"text":196,"correct":28},{"key":23,"text":198,"correct":21},{"key":26,"text":192,"correct":21},{"key":30,"text":194,"correct":21},{"id":244,"libraryId":5,"type":9,"typeLabel":15,"stem":245,"options":246,"answer":30,"analysis":32},897788,"（2019年真题）某进口设备人民币货币400万元，国际运费折合人民币30万元，运输保险费率为3‰，则该设备应计的运输保险费折合人民币（ ）万元。",[247,249,251,253],{"key":19,"text":248,"correct":21},"1.200",{"key":23,"text":250,"correct":21},"1.204",{"key":26,"text":252,"correct":21},"1.290",{"key":30,"text":254,"correct":28},"1.294",{"id":256,"libraryId":5,"type":9,"typeLabel":15,"stem":257,"options":258,"answer":26,"analysis":32},897789,"（2019年真题）设备原价的说法,正确的是（）。",[259,261,263,265],{"key":19,"text":260,"correct":21},"进口设备的原价是指其到岸价",{"key":23,"text":262,"correct":21},"国产设备原价应通过查询相关交易价格或向生产厂家询价获得",{"key":26,"text":264,"correct":28},"设备原价通常包含备品备件费在内",{"key":30,"text":266,"correct":21},"设备原价占设备购置费比重增大，意味着资本有机构成的提高",{"id":268,"libraryId":5,"type":9,"typeLabel":15,"stem":269,"options":270,"answer":23,"analysis":32},897792,"(2013年)施工过程中用于现场工人的防暑降温费，属于安全文明施工措施费中的()。",[271,273,275,277],{"key":19,"text":272,"correct":21},"环境保护",{"key":23,"text":274,"correct":28},"文明施工",{"key":26,"text":276,"correct":21},"安全施工",{"key":30,"text":278,"correct":21},"临时设施",{"id":280,"libraryId":5,"type":9,"typeLabel":15,"stem":281,"options":282,"answer":19,"analysis":32},897793,"(2015年)根据我国现行建筑安装工程费用项目组成的规定，下列关于措施项目费用的说法中正确的是( )。",[283,285,287,289],{"key":19,"text":284,"correct":28},"冬雨季施工费是冬、雨季施工增加的临时设施，防滑处理，雨雪排除等费用",{"key":23,"text":286,"correct":21},"施工排水、降水费有排水和降水两个独立的费用项目组成",{"key":26,"text":288,"correct":21},"当单层建筑物檐口高度超过15m，可计算超高施工增加费",{"key":30,"text":290,"correct":21},"已完工程及设备保护费是指分部工程或结构部位验收前，对已完工程及设备采取必要保护措施所发生的费用",{"id":292,"libraryId":5,"type":9,"typeLabel":15,"stem":293,"options":294,"answer":26,"analysis":32},897794,"(2016年)关于国外建筑安装工程费用的计算，下列说法正确的是（）。",[295,297,299,301],{"key":19,"text":296,"correct":21},"分包工程费不包括分包工程的管理费和利润",{"key":23,"text":298,"correct":21},"材料的预涨费计入管理费",{"key":26,"text":300,"correct":28},"开办费一般包括了工地清理费及完工后清理费",{"key":30,"text":302,"correct":21},"建设安装工程费用是以工程造价指数的形式衡量",{"id":304,"libraryId":5,"type":9,"typeLabel":15,"stem":305,"options":306,"answer":23,"analysis":32},897795,"(2010年)根据《建设工程工程量清单计价规范》（GB50500-2008）的规定，安全文明施工费应计列于()之中。",[307,309,311,313],{"key":19,"text":308,"correct":21},"分部分项工程量清单计价表",{"key":23,"text":310,"correct":28},"以计算基础乘费率的形式表示的措施项目清单与计价表",{"key":26,"text":312,"correct":21},"其他项目清单与计价汇总表",{"key":30,"text":314,"correct":21},"规费、税金项目清单与计价表",{"id":316,"libraryId":5,"type":9,"typeLabel":15,"stem":317,"options":318,"answer":19,"analysis":32},897796,"(2013年)在国外建筑安装工程费用构成中，承包商投标报价时不计入和分摊进单价，而需单独列项的是()。",[319,321,323,325],{"key":19,"text":320,"correct":28},"临时设施费",{"key":23,"text":322,"correct":21},"总部管理费",{"key":26,"text":324,"correct":21},"利润",{"key":30,"text":326,"correct":21},"税金",{"id":328,"libraryId":5,"type":9,"typeLabel":15,"stem":329,"options":330,"answer":26,"analysis":32},897797,"(2013年)关于规费的计算，下列说法正确的是()。",[331,333,335,337],{"key":19,"text":332,"correct":21},"规费虽具有强制性，但根据其组成又可以细分为可竞争性的费用和不可竞争性的费用",{"key":23,"text":334,"correct":21},"规费由社会保险费和工程排污费组成",{"key":26,"text":336,"correct":28},"社会保险费由养老保险费、失业保险费、医疗保险费、生育保险费、工伤保险费组成",{"key":30,"text":338,"correct":21},"规费由意外伤害保险费、住房公积金、工程排污费组成",{"id":340,"libraryId":5,"type":9,"typeLabel":15,"stem":341,"options":342,"answer":23,"analysis":32},897798,"(2014年)根据我国现行建筑安装工程费用项目组成的规定，下列有关费用的表述中不正确的是（）",[343,345,347,349],{"key":19,"text":344,"correct":21},"人工费是指支付给直接从事建筑安装工程施工作业的生产工人和附属生产单位工人的各项费用",{"key":23,"text":346,"correct":28},"材料费中的材料单价由材料原价、材料运杂费、运输损耗费、材料损耗费、采购及保管费五项组成",{"key":26,"text":348,"correct":21},"材料费包含构成或计划构成永久工程一部分的工程设备费",{"key":30,"text":350,"correct":21},"施工机具使用费包含仪器仪表使用费",{"id":352,"libraryId":5,"type":9,"typeLabel":15,"stem":353,"options":354,"answer":19,"analysis":32},897799,"(2015年)根据我国现行建筑安装工程费项目组成的规定，下列费用应列入暂列金额的是()。",[355,357,359,361],{"key":19,"text":356,"correct":28},"施工过程中可能发生的工程变更及索赔、现场签证等费用",{"key":23,"text":358,"correct":21},"应建设单位要求，完成建设项目之外的零星项目费用",{"key":26,"text":360,"correct":21},"对建设单位自行采购的材料进行保管所发生的费用",{"key":30,"text":362,"correct":21},"施工用电、用水的开办费",{"id":364,"libraryId":5,"type":9,"typeLabel":15,"stem":365,"options":366,"answer":23,"analysis":32},897800,"(2016年)根据我国现行建筑安装工程费用项目构成的规定，下列费用中属于安全文明费的是()。",[367,369,371,373],{"key":19,"text":368,"correct":21},"夜间施工时，临时可移动照明灯具的设置、拆除费用",{"key":23,"text":370,"correct":28},"工人的安全防护用品的购置费用",{"key":26,"text":372,"correct":21},"地下室施工时所采用的照明设施拆除费",{"key":30,"text":374,"correct":21},"建筑物的临时保护设施费",{"id":376,"libraryId":5,"type":9,"typeLabel":15,"stem":377,"options":378,"answer":19,"analysis":32},897801,"(2017年)根据现行建筑安装工程费用项目组成的规定，下列费用项目中，属于施工机具使用费的是（）。",[379,381,383,385],{"key":19,"text":380,"correct":28},"仪器仪表使用费",{"key":23,"text":382,"correct":21},"施工机械财产保险费",{"key":26,"text":384,"correct":21},"大型机械进出费",{"key":30,"text":386,"correct":21},"大型机械安拆费",{"id":388,"libraryId":5,"type":9,"typeLabel":15,"stem":389,"options":390,"answer":26,"analysis":32},897802,"(2018年)根据现行建筑安装工程费用项目组成规定，下列关于施工企业管理费中工具用具使用费的说法正确的是（ ）",[391,393,395,397],{"key":19,"text":392,"correct":21},"指企业管理使用，而非施工生产使用的工具用具费用",{"key":23,"text":394,"correct":21},"指企业施工生产使用，而非企业管理使用的工具用具费用",{"key":26,"text":396,"correct":28},"采用一般计税方法时，工具用具使用费中增值税进项税额可以抵扣",{"key":30,"text":398,"correct":21},"包括各类资产标准的工具用具的购置、维修和摊销费用",{"id":400,"libraryId":5,"type":9,"typeLabel":15,"stem":401,"options":402,"answer":26,"analysis":32},897803,"(2018年)依照国外建筑安装工程费用构成惯例，关于其直接工程费中的人工费，下列说法正确的是（）。",[403,405,407,409],{"key":19,"text":404,"correct":21},"工人按技术等级划分为技工、普工和壮工",{"key":23,"text":406,"correct":21},"平均工资应按各类工人工资的算术平均值计算",{"key":26,"text":408,"correct":28},"包括工资、加班费、津贴、招雇解雇费",{"key":30,"text":410,"correct":21},"包括工资、加班费和代理人费用",{"id":412,"libraryId":5,"type":9,"typeLabel":15,"stem":413,"options":414,"answer":23,"analysis":32},897804,"(2014年)关于建筑安装工程费用中的规费，下列说法中正确的是（）",[415,417,419,421],{"key":19,"text":416,"correct":21},"规费是指由县级及以上有关权利部门规定必须缴纳或计取的费用",{"key":23,"text":418,"correct":28},"规费包括住房公积金",{"key":26,"text":420,"correct":21},"投标人在投标报价时填写的规费可高于规定的标准",{"key":30,"text":422,"correct":21},"社会保险费中包括建筑安装工程一切险的投保费用",{"id":424,"libraryId":5,"type":9,"typeLabel":15,"stem":425,"options":426,"answer":30,"analysis":32},897805,"(2018年)根据现行建筑安装工程费用项目组成规定，下列费用项目属于按造价形成划分的是（ ）。",[427,429,431,432],{"key":19,"text":428,"correct":21},"人工费",{"key":23,"text":430,"correct":21},"企业管理费",{"key":26,"text":324,"correct":21},{"key":30,"text":326,"correct":28},{"id":434,"libraryId":5,"type":9,"typeLabel":15,"stem":435,"options":436,"answer":26,"analysis":32},897806,"（2019年真题）在工程量单价中，下列关于暂估价的说法，正确的是（）",[437,439,441,443],{"key":19,"text":438,"correct":21},"材料设备暂估价是指用于尚未确定或不可预见的材料、设备采购的费用",{"key":23,"text":440,"correct":21},"纳入分部分项工程项目清单综合单价中的材料暂估价包括暂估单价及数量",{"key":26,"text":442,"correct":28},"专业工程暂估价与分部分项工程综合单价在费用构成方面应保持一致",{"key":30,"text":444,"correct":21},"专业工程暂估价由投标人自主报价",{"id":446,"libraryId":5,"type":9,"typeLabel":15,"stem":447,"options":448,"answer":23,"analysis":32},897807,"（2019年真题）根据现行工程量计算规范，适宜采用分部分项工程项目清单计价方式计价的措施项目费是（）",[449,451,453,455],{"key":19,"text":450,"correct":21},"二次搬运费",{"key":23,"text":452,"correct":28},"超高施工增加费",{"key":26,"text":454,"correct":21},"已完工程及设备保护费",{"key":30,"text":456,"correct":21},"地上、地下设施临时保护费",{"id":458,"libraryId":5,"type":9,"typeLabel":15,"stem":459,"options":460,"answer":23,"analysis":32},897808,"（2019年真题）下列费用中属于安全文明施工费的是( ) 。",[461,463,464,465],{"key":19,"text":462,"correct":21},"脚手架费",{"key":23,"text":320,"correct":28},{"key":26,"text":450,"correct":21},{"key":30,"text":466,"correct":21},"非夜间施工照明",{"id":468,"libraryId":5,"type":9,"typeLabel":15,"stem":469,"options":470,"answer":30,"analysis":32},897809,"（2019年真题）下列费用项目中属于施工仪器仪表台班单价构成内容的是（ ）",[471,472,474,476],{"key":19,"text":428,"correct":21},{"key":23,"text":473,"correct":21},"燃料费",{"key":26,"text":475,"correct":21},"检测软件费",{"key":30,"text":477,"correct":28},"校验费",{"id":479,"libraryId":5,"type":9,"typeLabel":15,"stem":480,"options":481,"answer":19,"analysis":32},897810,"（2019年真题）根据国外建筑安装工程费用的构成，施工工人的招雇解雇费用一般计入（）。",[482,484,486,488],{"key":19,"text":483,"correct":28},"直接工程费",{"key":23,"text":485,"correct":21},"现场管理费",{"key":26,"text":487,"correct":21},"公司办理费",{"key":30,"text":489,"correct":21},"开办费",{"id":491,"libraryId":5,"type":9,"typeLabel":15,"stem":492,"options":493,"answer":26,"analysis":32},897811,"（2019年真题）在工程量清单计价中，下列费用项目应计入总承包服务费的是（ ）",[494,496,498,500],{"key":19,"text":495,"correct":21},"总承包人的工程分包费",{"key":23,"text":497,"correct":21},"总承包人的管理费",{"key":26,"text":499,"correct":28},"总承包人对发包人自行采购材料的保管费",{"key":30,"text":501,"correct":21},"总承包工程的竣工验收费",{"id":503,"libraryId":5,"type":9,"typeLabel":15,"stem":504,"options":505,"answer":30,"analysis":32},897816,"(2013年)下列费用项目中，计入工程建设其他费中专利及专有技术使用费的是()。",[506,508,510,512],{"key":19,"text":507,"correct":21},"专利及专有技术在项目全寿命期的使用费",{"key":23,"text":509,"correct":21},"在生产期支付的商标权费",{"key":26,"text":511,"correct":21},"国内设计资料费",{"key":30,"text":513,"correct":28},"国外设计资料费",{"id":515,"libraryId":5,"type":9,"typeLabel":15,"stem":516,"options":517,"answer":19,"analysis":32},897817,"(2014年)关于建设用地的取得及使用年限，下列说法正确的是（）",[518,520,522,524],{"key":19,"text":519,"correct":28},"获取建设用地使用权的方式可以是租赁或转让",{"key":23,"text":521,"correct":21},"通过协议出让获取土地使用权的方式分为投标、竞拍、挂牌三种",{"key":26,"text":523,"correct":21},"城市公益事业用地不得以划拨方式取得",{"key":30,"text":525,"correct":21},"将土地使用权无偿交付给使用者的，其土地使用年限最高为70年",{"id":527,"libraryId":5,"type":9,"typeLabel":15,"stem":528,"options":529,"answer":19,"analysis":32},897818,"(2016年)下列与建设用地有关的费用中，归农村集体经济组织所有的是()。",[530,532,534,536],{"key":19,"text":531,"correct":28},"土地补偿费",{"key":23,"text":533,"correct":21},"青苗补偿费",{"key":26,"text":535,"correct":21},"拆迁补偿费",{"key":30,"text":537,"correct":21},"新菜地开发建设基金",{"id":539,"libraryId":5,"type":9,"typeLabel":15,"stem":540,"options":541,"answer":30,"analysis":32},897819,"(2013年)下列费用项目中，属于工程建设其他费中研究试验费的是()。",[542,544,546,548],{"key":19,"text":543,"correct":21},"新产品试制费",{"key":23,"text":545,"correct":21},"水文地质勘察费",{"key":26,"text":547,"correct":21},"特殊设备安全监督检验费",{"key":30,"text":549,"correct":28},"委托专业机构验证设计参数而发生的验证费",{"id":551,"libraryId":5,"type":9,"typeLabel":15,"stem":552,"options":553,"answer":19,"analysis":32},897820,"(2014年)关于征地补偿费用，下列表述中正确的是（）",[554,556,558,560],{"key":19,"text":555,"correct":28},"地上附着物补偿应根据协调征地方案前地上附着物的实际情况确定",{"key":23,"text":557,"correct":21},"土地补偿和安置补偿费的总和不得超过土地被征用前三年平均年产值的15倍",{"key":26,"text":559,"correct":21},"征用未开发的规划菜地按一年只种一茬的标准缴纳新菜地开发建设基金",{"key":30,"text":561,"correct":21},"征收耕地占用税时，对于占用前三年曾用于种植农作物的土地不得视为耕地",{"id":563,"libraryId":5,"type":9,"typeLabel":15,"stem":564,"options":565,"answer":19,"analysis":32},897821,"(2015年)下列费用项目中，应在研究试验费中列支的是()。",[566,568,570,572],{"key":19,"text":567,"correct":28},"为验证设计数据而进行必要的研究试验所需的费用",{"key":23,"text":569,"correct":21},"新产品试验费",{"key":26,"text":571,"correct":21},"施工企业技术革新的研究试验费",{"key":30,"text":573,"correct":21},"设计模型制作费",{"id":575,"libraryId":5,"type":9,"typeLabel":15,"stem":576,"options":577,"answer":23,"analysis":32},897822,"(2015年)关于联合试运转费，下列说法中正确的是()。",[578,580,582,584],{"key":19,"text":579,"correct":21},"包括对整个生产线或装置运行无负荷和有负荷试运转所发生的费用",{"key":23,"text":581,"correct":28},"包括施工单位参加试运转人员的工资以及专家指导费",{"key":26,"text":583,"correct":21},"包括试运转中暴露的因设备缺陷发生的处理费用",{"key":30,"text":585,"correct":21},"包括对单台设备进行单机试运转工作的调试费",{"id":587,"libraryId":5,"type":9,"typeLabel":15,"stem":588,"options":589,"answer":26,"analysis":32},897823,"(2016年)关于工程建设其他费用，下列说法中正确的是()。",[590,592,594,596],{"key":19,"text":591,"correct":21},"建设单位管理费一般按建筑安装工程费乘以相应费率计算",{"key":23,"text":593,"correct":21},"研究试验费包括新产品试制费",{"key":26,"text":595,"correct":28},"改扩建项目的场地准备及临时设施费一般只计拆除清理费",{"key":30,"text":597,"correct":21},"不拥有产权的专用通信设施投资，列入市政公用设施费",{"id":599,"libraryId":5,"type":9,"typeLabel":15,"stem":600,"options":601,"answer":23,"analysis":32},897824,"(2018年)关于建设项目场地准备和建设单位临时设施费的计算,下列说法正确的是（ ）。",[602,604,606,608],{"key":19,"text":603,"correct":21},"改扩建项目一般应计工程费用和拆除清理费",{"key":23,"text":605,"correct":28},"凡可回收材料的拆除工程应采用以料抵工方式冲抵拆除清理费",{"key":26,"text":607,"correct":21},"新建项目应根据实际工程量计算，不按工程费用的比例计算",{"key":30,"text":609,"correct":21},"新建项目应按工程费用比例计算，不根据实际工程量计算",[611,614,617,620,623,626],{"id":9,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":9},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]