[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900077":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},900077,582,2,"多选题","（2016年考题）承包人应在每个计量周期到期后，向发包人提交已完工程进度款支付申请，支付申请包括的内容有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","累计已完成的合同价款",true,{"key":16,"text":17,"correct":14},"B","本期合计完成的合同价款",{"key":19,"text":20,"correct":14},"C","本期合计应扣减的金额",{"key":22,"text":23,"correct":24},"D","累计已调整的合同金额",false,{"key":26,"text":27,"correct":24},"E","预计下期将完成的合同价款","ABC","本题考查的是预付款及期中支付。承包人应在每个计量周期到期后向发包人提交已完工程进度款支付申请一式四份，详细说明此周期认为有权得到的款额，包括分包人已完工程的价款。支付申请的内容包括：（1）累计已完成的合同价款；（2）累计已实际支付的合同价款；（3）本周期合计完成的合同价款；（4）本周期合计应扣减的金额；（5）本周期实际应支付的合同价款。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]