[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900011":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},900011,582,2,"多选题","（2017年考题）下列工人工作时间中，属于有效工作时间的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","基本工作时间",true,{"key":16,"text":17,"correct":18},"B","不可避免中断时间",false,{"key":20,"text":21,"correct":14},"C","辅助工作时间",{"key":23,"text":24,"correct":18},"D","偶然工作时间",{"key":26,"text":27,"correct":14},"E","准备与结束工作时间","ACE","有效工作时间包括：基本工作时间、辅助工作时间、准备与结束工作时间。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]