[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-900010":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},900010,582,2,"多选题","（2020年真题）根据现行《建设工程工程量清单计价规范》，关于工程量清单的特点和应用，下列说法正确的有（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","分为招标工程量清单和已标价工程量清单",true,{"key":16,"text":17,"correct":14},"B","以单位（项）工程为单位编制",{"key":19,"text":20,"correct":21},"C","是招标文件的组成部分",false,{"key":23,"text":24,"correct":21},"D","是载明发包工程内容和数量的清单，不涉及金额",{"key":26,"text":27,"correct":21},"E","仅用于最高投标限价和投标报价的编制","AB","P42-44 A选项正确、D选项错误：工程量清单又可分为招标工程量清单和已标价工程量清单； B选项正确：招标工程量清单应以单位（项）工程为单位编制； C选项错误：招标工程量清单必须作为招标文件的组成部分，工程量清单应是载明建设工程项目名称、项目特征、计量单位和工程数量等的明细清单，中标后，业主要与中标单位签订施工合同，中标价就是确定合同价的基础，投标清单上的单价就成了拨付工程款的依据。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]