[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899812":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899812,582,2,"多选题","下列费用包含或可能包含在材料价格中材料运杂费的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","附加工作费",true,{"key":16,"text":17,"correct":14},"B","装卸费",{"key":19,"text":20,"correct":21},"C","运输损耗",false,{"key":23,"text":24,"correct":14},"D","调车费",{"key":26,"text":27,"correct":14},"E","运输费","ABDE","2020版教材P68 材料运杂费包含外埠中转运输过程中发生的一切费用和过境过桥费用，包括调车和驳船费、装卸费、运输费及附加工作费。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]