[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899779":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899779,582,2,"多选题","根据《建设工程工程量清单计价规范》的规定，其他项目清单的暂列金额部分包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工合同签订时不可预见的所需材料采购费用",true,{"key":16,"text":17,"correct":18},"B","总承包服务费",false,{"key":20,"text":21,"correct":14},"C","尚未确定的所需服务的采购费用",{"key":23,"text":24,"correct":18},"D","材料的暂估单价",{"key":26,"text":27,"correct":14},"E","合同约定的可能发生的工程价款调整费用","ACE","2020版教材P49 暂列金额是指用于施工合同签订时尚未确定或者不可预见的所需材料、设备、服务的采购，施工中可能发生的工程变更、合同约定调整因素出现时的工程价款调整以及发生的索赔、现场签证确认等的费用。因此，ACE选项符合要求。考试注意区分暂列金额和暂估价。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]