[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899777":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899777,582,2,"多选题","根据《建设工程工程量清单计价规范》（GB 10500——2013），在其他项目清单中，应由投标人自主确定价格的有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","暂列金额",false,{"key":16,"text":17,"correct":14},"B","专业工程暂估价",{"key":19,"text":20,"correct":14},"C","材料暂估价单价",{"key":22,"text":23,"correct":24},"D","计日工单价",true,{"key":26,"text":27,"correct":24},"E","总承包服务费","DE","2020版教材P51 计日工表的项目名称、暂定数量由招标人填写，编制招标控制时，单价由招标人按有关计价规定确定；投标时，单价由投标人自主报价，按暂定数量计算合价计入投标总价中； 总承包服务费计价表中项目名称、服务内容由招标人填写，编制招标控制价时，费率及金额由招标人按有关计价规定确定；投标时，费率及金额由投标人自主报价，计入投标总价中。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]