[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899722":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899722,582,2,"多选题","能够用㎡作为计算单位的措施项目包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","垂直运输费",true,{"key":16,"text":17,"correct":18},"B","施工排水、降水费",false,{"key":20,"text":21,"correct":14},"C","超高施工增加费",{"key":23,"text":24,"correct":18},"D","场地平整费",{"key":26,"text":27,"correct":18},"E","已完工程及设备保护费","AC","2020版教材P18 垂直运输费可根据需要用两种方法进行计算：①按照建筑面积以m'为单位计算；②按照施工工期日历天数以天为单位计算。垂直运输费可根据需要用两种方法进行计算：①按照建筑面积以㎡为单位计算；②按照施工工期日历天数以天为单位计算。场地平整费虽然也可以用mL作为计算单位，但不属于措施费。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]