[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899721":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899721,582,2,"多选题","关于措施费中超高施工增加费，下列说法正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","单层建筑檐口高度超过30m时计费",false,{"key":16,"text":17,"correct":18},"B","多层建筑超过6层时计算",true,{"key":20,"text":21,"correct":18},"C","包括建筑超高引起的人工工效降低费",{"key":23,"text":24,"correct":14},"D","不包括通信联络设备的使用费",{"key":26,"text":27,"correct":18},"E","按建筑物超高部分建筑面积以“㎡”为单位计算","BCE","2020版教材P17 当单层建筑物檐口高度超过20m，多层建筑物超过6层时，可计算超高施工增加费，超高施工增加费的内容由以下各项组成： 1）建筑物超高引起的人工工效降低以及由于人工工效降低引起的机械降效费； 2）高层施工用水加压水泵的安装、拆除及工作台班费； 3）通信联络设备的使用及摊销费。超高施工增加费通常按照建筑物超高部分的建筑面积以㎡为单位计算。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]