[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899683":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899683,582,2,"多选题","下列各项中，属于工程索赔合同价款调整事项的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目特征不符",false,{"key":16,"text":17,"correct":18},"B","提前竣工",true,{"key":20,"text":21,"correct":14},"C","工程量清单缺项",{"key":23,"text":24,"correct":18},"D","误期赔偿",{"key":26,"text":27,"correct":14},"E","工程量偏差","BD","工程索赔类，主要包括哦哦不可抗力、提前竣工、误期赔偿、索赔等事件。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]