[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899677":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899677,582,2,"多选题","根据《建设项目工程总承包合同示范文本》（GF-2011-0216），以下情形中属于应对合同价款进行调整的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","合同变更",false,{"key":16,"text":17,"correct":18},"B","法律法规变化影响的合同价格增减",true,{"key":20,"text":21,"correct":18},"C","工程造价管理部门公布的价格调整造成工程成本增减",{"key":23,"text":24,"correct":14},"D","一周内停水、停电等造成累计停工超过8 小时",{"key":26,"text":27,"correct":18},"E","发包人批准的变更估算的增减","BCE","合同价格调整包括以下情形：（1）合同签订后，因法律、行政法规、国家政策和需遵守的行业规定，影响合同价格增减的。（2）合同执行过程中，工程造价管理部门公布的价格调整，涉及承包人投入成本增减的。（3）一周内非承包人原因的停水、停电、停气、道路中断等，造成工程现场停工累计超过 8 小时的（承包人须提交报告并提供可证实的证明和估算）。（4）发包人批准的变更估算的增减。（5）本合同约定的其他增减的款项调整。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]