[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899656":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899656,582,2,"多选题","下列有关暂列金额的表述，正确的有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","用于施工合同签订时尚未确定或者不可预见的所需材料、设备、服务的采购",true,{"key":16,"text":17,"correct":14},"B","用于施工中可能发生的工程变更、合同约定调整因素出现时的工程价款调整",{"key":19,"text":20,"correct":14},"C","用于发生的索赔、现场签证确认等的费用",{"key":22,"text":23,"correct":24},"D","用于支付必然发生但暂时不能确定价格的材料的单价",false,{"key":26,"text":27,"correct":24},"E","用于因为标准不明确或者需要有专业承包人完成，暂时无法确定价格的费用","ABC","选项 D 是材料暂估价。选项 E 是专业工程暂估价。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]