[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899645":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899645,582,2,"多选题","采用生产能力指数法估算项目的静态投资，主要应用于（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","设计已经达到一定深度",false,{"key":16,"text":17,"correct":18},"B","拟建建设项目与类似建设项目的规模不同",true,{"key":20,"text":21,"correct":18},"C","设计定型并系列化",{"key":23,"text":24,"correct":14},"D","行业内相关指数和系数等基础资料不完备",{"key":26,"text":27,"correct":14},"E","有详细的工程设计资料","BC","生产能力指数法主要应用于设计深度不足，拟建建设项目与类似建设项目的规模不同，设计定型并系列化，行业内相关指数和系数等基础资料完备的情况。这种方法不需要详细的工程设计资料，只需要知道工艺流程及规模就可以，在总承包报价时，承包商大都采用该方法。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]