[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899635":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899635,582,2,"多选题","下列用工项目中，构成预算定额人工工日消耗量但不包括在劳动定额中的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","材料水平搬运用工",false,{"key":16,"text":17,"correct":18},"B","材料加工用工和电焊点火用工",true,{"key":20,"text":21,"correct":18},"C","工序交接时对前一工序修整用工",{"key":23,"text":24,"correct":18},"D","工作质量检查和隐蔽工程验收工作的影响",{"key":26,"text":27,"correct":14},"E","完成施工任务必须消耗的技术工种用工","BCD","预算定额人工工日消耗量包括基本用工，辅助用工，超运距用工，人工幅度差用工。B 项是辅助用工， CD 项是人工幅度差用工，基本用工包含在劳动定额中。材料水平搬运用工、完成施工任务必须消耗的技术工种用工都属于基本用工。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]