[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899592":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899592,582,2,"多选题","(2013年)关于新增固定资产价值的确定，下列说法中正确的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","新增固定资产价值是以独立发挥生产能力的单项工程为对象计算的",true,{"key":16,"text":17,"correct":18},"B","分期分批交付的工程，应在最后一期（批）交付时一次性计算新增固定资产价值",false,{"key":20,"text":21,"correct":18},"C","凡购置的达到固定资产标准不需安装的设备，应计入新增固定资产价值",{"key":23,"text":24,"correct":14},"D","运输设备等固定资产，仅计算采购成本，不计分摊的“待摊投资”",{"key":26,"text":27,"correct":14},"E","建设单位管理费按建筑工程、安装工程以及需安装设备价值总额按比例分摊","ADE","选项B，分期分批交付生产或使用的工程，应分期分批计算新增固定资产价值；选项C，凡购置的达到固定资产标准不需要安装的设备，应该交付使用后计入新增固定资产价值。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]