[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899564":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899564,582,2,"多选题","(2018年)根据《建设工程施工合同(示范文本)》(GF-2013-0201)，下列事项应纳入工程变更范围的有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","改变工程的标高",true,{"key":16,"text":17,"correct":14},"B","改变工程的实施顺序",{"key":19,"text":20,"correct":14},"C","提高合同中的工作质量标准",{"key":22,"text":23,"correct":24},"D","将合同中的某项工作转由他人实施",false,{"key":26,"text":27,"correct":24},"E","工程设备价格的变化","ABC","工程变更的范围和内容包括： （1）增加或减少合同中任何工作，或追加额外的工作； （2）取消合同中任何工作，但转由他人实施的工作除外； （3）改变合同中任何工作的质量标准或其他特性； （4）改变工程的基线、标高、位置和尺寸； （5）改变工程的时间安排或实施顺序。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]