[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899544":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899544,582,2,"多选题","(2018年)根据《建设工程工程量清单计价规范》(GB50500-2013)，关于投标文件措施项目计价表的编制，下列说法正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","单价措施项目计价表应采用综合单价方式计价",true,{"key":16,"text":17,"correct":18},"B","总价措施项目计价表应包含规费和建筑业增值税",false,{"key":20,"text":21,"correct":14},"C","不能精确计量的措施项目应编制总价措施项目计价表",{"key":23,"text":24,"correct":18},"D","总价措施项目的内容确定与招标人拟定的措施清单无关",{"key":26,"text":27,"correct":18},"E","总价措施项目的内容确定与投标人投标时拟定的施工组织设计无关","AC","对于不能精确计量的措施项目，应编制总价措施项目清单与计价表，C 正确；措施项目的内容应依据招标人提供的措施项目清单和投标人投标时拟定的施工组织设计或施工方案确定，D、E 错误。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]