[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899537":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899537,582,2,"多选题","(2015年)复核工程量是投标人编制投标报价前的一项重要工作。通过复核工程量，便于投标人( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","决定报价尺度",true,{"key":16,"text":17,"correct":14},"B","采取合适的施工方法",{"key":19,"text":20,"correct":14},"C","选用合适的施工机具",{"key":22,"text":23,"correct":14},"D","决定投入劳动力数量",{"key":25,"text":26,"correct":27},"E","选用合适的承包方式",false,"ABCD","该题主要考察的是：建设项目施工投标与投标文件的编制 “复核工程量的目的：(1)得到与招标工程量的差距，考虑投标策略，决定报价尺度；(2)根据工程量的大小采取合适的施工方法，选择适用、经济的机械和劳动力数量。”",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]