[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899455":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},899455,582,2,"多选题","(2016年)应予计量的措施项目费包括()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","垂直运输费",true,{"key":16,"text":17,"correct":14},"B","排水.降水费",{"key":19,"text":20,"correct":21},"C","冬雨季施工增加费",false,{"key":23,"text":24,"correct":21},"D","临时设施费",{"key":26,"text":27,"correct":14},"E","超高施工增加费","ABE","应予计量的措施项目：1.脚手架；2.混凝土模板及支架（撑）费；3.垂直运输费；4.超高施工增加费；5.大型机械设备进出场及安拆费；6.施工排水、降水费。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程计价","建筑工程",0]