[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899433":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},899433,582,1,"单选题","（2020年真题）根据现行《标准设计施工总承包招标文件》，选用暂估价 （A）条款时，若发包人在价格清单中给定暂估价的材料，不属于依法必须招标的，则其价格与暂估价的差额应经确认后计入合同价款，履行该确认职能的应是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","发包人",false,{"key":16,"text":17,"correct":14},"B","监理人",{"key":19,"text":20,"correct":21},"C","总承包人",true,{"key":23,"text":24,"correct":14},"D","材料供应商","P274-280 暂估价（A）条款。发包人在价格清单中给定暂估价的专业服务、材料和工程设备不属于依法必须招标的范围或未达到规定的规模标准的，应由承包人按合同约定提供。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]