[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899373":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},899373,582,1,"单选题","（2020年真题）某项目施工合同约定，由承包人承担±10%范围内的碎石价格风险，超出部分采用造价信息法调差。已知承包人投标价格、基准期的价格分别为100\u002Fm3、96元\u002Fm3，2020年7月的造价信息发布价为130元\u002Fm3，则该月碎石的实结算价格为（ ）元\u002Fm3。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","117.0",false,{"key":16,"text":17,"correct":18},"B","120.0",true,{"key":20,"text":21,"correct":14},"C","124.4",{"key":23,"text":24,"correct":14},"D","130.0","P241-244 130-100*1.1+100=120.0元。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]