[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899317":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},899317,582,1,"单选题","（2020年真题）关于建设工程投标报价的编制，下列说法正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可不考虑拟订合同中的工程变更条款",false,{"key":16,"text":17,"correct":18},"B","应仔细研究招标文件中给定的工程技术标准",true,{"key":20,"text":21,"correct":14},"C","可不考虑施工现场用地情况",{"key":23,"text":24,"correct":14},"D","不必关注工程所在地气象资料","P196-198 一：研究招标文件：1.投标人须知；2.合同分析（工程变更及相应的合同价款调整）；3.技术标准和要求分析；4.图纸分析；二：调查工程现场：1.自然条件调查；2.施工条件调查；",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]