[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899311":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},899311,582,1,"单选题","（2016年考题）施工项目投标报价的工作包括：①收集投标信息；②选择报价策略；③组建投标班子；④确定基础标价；⑤确定投标报价；⑥研究招标文件，以上工作正确的先后顺序是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","⑥①③②④⑤",false,{"key":16,"text":17,"correct":18},"B","③⑥①④②⑤",true,{"key":20,"text":21,"correct":14},"C","③①⑥②④⑤",{"key":23,"text":24,"correct":14},"D","⑥③①④②⑤","本题考查的是建设项目施工投标与投标文件的编制。根据教材P191，图4.3.1，施工投标报价流程图可知，题干中工作的正确顺序是：组建投标班子、研究招标文件、收集投标信息、确定基础标价、选择报价策略、确定投标报价。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]