[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899289":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},899289,582,1,"单选题","（2016年考题）关于暂列金额，下列说法中正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","用于必须要发生但暂时不能确定价格的项目",false,{"key":16,"text":17,"correct":14},"B","由承包人支配，按签证价格结算",{"key":19,"text":20,"correct":14},"C","不能用于因工程变更而发生的索赔支付",{"key":22,"text":23,"correct":24},"D","不同专业预留的暂列金额应分别列项",true,"本题考查的是招标工程量清单的编制。选项A暂列金额是指招标人暂定并包括在合同中的一笔款项。选项B暂列金额由招标人支配。选项C可以用于施工中可能发生的工程变更。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]