[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899276":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},899276,582,1,"单选题","（2017年考题）根据《建设工程工程量清单计价规范》（GB50500-2013），关于招标控制价的编制要求，下列说法中正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","应依据投标人拟定的施工方案进行编制",false,{"key":16,"text":17,"correct":14},"B","应包括招标文件中要求招标人承担风险的费用",{"key":19,"text":20,"correct":14},"C","应由招标工程量清单编制单位负责编制",{"key":22,"text":23,"correct":24},"D","应使用行业和地方的计价定额与相关文件计价",true,"招标控制价是指根据国家或省级建设行政主管部门颁发的有关计价依据和办法，依据拟定的招标文件和招标工程量清单，结合工程具体情况发布的招标工程的最高投标限价；综合单价中应包括招标文件中要求投标人所承担的风险内容及其范围所产生的风险费用。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]