[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899267":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},899267,582,1,"单选题","（2019年考题）施工图预算以二级预算编制形成（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总预算和单位工程预算",true,{"key":16,"text":17,"correct":18},"B","单位工程综合预算和单位工程预算",false,{"key":20,"text":21,"correct":18},"C","总预算和单位工程综合预算",{"key":23,"text":24,"correct":18},"D","建筑工程预算和设备安装工程预算","施工图预算的二级预算编制形式：建设项目总预算和单位工程预算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]