[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899245":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},899245,582,1,"单选题","（2019年考题）某地市政道路工程，已知与其关似已完工程造价指标为600元\u002Fm2，人、材、机占工程造价10%，50%，20%，拟建工程与类似工程人、材、机差异系数为1.1，1.05，1.05，假定以人、材、机为基数取，综合率为25%，则该工程综合单价为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","507",false,{"key":16,"text":17,"correct":14},"B","608.4",{"key":19,"text":20,"correct":21},"C","633.75",true,{"key":23,"text":24,"correct":14},"D","657","工料单价=600×0.8=480 元\u002F㎡，人、材、机占工料单价的比重分别为：12.5%，62.5%，25%。该工程的工料单价为：480×（12.5%×1.1+62.5%×1.05+25%×1.05）=507元\u002F㎡。题中已知，以人、材、机为基数取费，综合费率为25%， 则该工程综合单价为507 ×（1+25%）=633.75 元\u002F㎡。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]