[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899234":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},899234,582,1,"单选题","（2020年真题）关于项目决策与工程造价的关系，下列说法正确的是（）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目不同决策阶段的投资估算精度要求是一致的",false,{"key":16,"text":17,"correct":14},"B","项目决策的内容与工程造价无关",{"key":19,"text":20,"correct":14},"C","项目决策的正确性不影响设备选型",{"key":22,"text":23,"correct":24},"D","工程造价的金额影响项目决策的结果",true,"P119-127 A选项错误：项目不同决策阶段的投资估算精度要求不同 B选项错误：项目决策的内容是决定工程造价的基础 C选项错误：项目决策的正确性是工程造价合理性的前提 D选项正确：工程造价的数额影响项目决策的结果。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]