[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899180":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},899180,582,1,"单选题","（2020年真题）对工人工作时间消耗的分类中属于必需消耗时间而被计入时间定额的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","偶然工作时间",false,{"key":16,"text":17,"correct":18},"B","工人休息时间",true,{"key":20,"text":21,"correct":14},"C","施工本身造成的停工时间",{"key":23,"text":24,"correct":14},"D","非施工本身造成的停工时间","P54-60 必需消耗的时间包括有效工作时间、休息时间和不可避免的中断时间。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]