[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899152":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},899152,582,1,"单选题","（2017年考题）关于建设工程的分部组合计价，下列说法中正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","适用于没有具体图样和工程量清单的建设项目计价",false,{"key":16,"text":17,"correct":18},"B","要求将建设项目细分到最基本的构造单元",true,{"key":20,"text":21,"correct":14},"C","是利用产出函数进行计价",{"key":23,"text":24,"correct":14},"D","具有自上而下、由粗到细的计价组合特点","工程造价计价的主要思路就是将建设项目细分至最基本的构造单元，找到了适当的计量单位及当时当地的单价，就可以采取一定的计价方法，进行分部组合汇总，计算出相应工程造价。工程计价的基本原理就在于项目的分解与组合。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]