[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899149":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},899149,582,1,"单选题","（2015年考题）根据我国建设市场发展现状，工程量清单计价和计量规范主要适用于（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目建设前期各阶段工程造价的估量",false,{"key":16,"text":17,"correct":14},"B","项目初步设计阶段概算的预测",{"key":19,"text":20,"correct":14},"C","项目施工图设计阶段预算的预测",{"key":22,"text":23,"correct":24},"D","项目合同价格的形成和后续合同价格的管理",true,"从目前我国现状来看，工程定额主要用于在项目建设前期各阶段对于建设投资的预测和估计，在工程建设交易阶段，工程定额通常只能作为建设产品价格形成的辅助依据。工程量清单计价依据主要适用于合同价格形成以及后续的合同价格管理阶段。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]