[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899098":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},899098,582,1,"单选题","（2015年考题）关于联合试运转费，下列说法中正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","包括对整个生产线或装置运行无负荷和有负荷试运转所发生的费用",false,{"key":16,"text":17,"correct":18},"B","包括施工单位参加试运转人员的工资及专家指导费",true,{"key":20,"text":21,"correct":14},"C","包括试运转中暴露的因设备缺陷发生的处理费用",{"key":23,"text":24,"correct":14},"D","包括对单台设备进行单机试运转工作的调试费","联合试运转费是试运转支出大于收入的差额部分费用，其中试运转支出包括试运转所需原材料、燃料及动力消耗、低值易耗品、其他物料消耗、工具用具使用费、机械使用费、保险金、施工单位参加试运转人员工资、以及专家指导费等。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]