[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-899065":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},899065,582,1,"单选题","新增固定资产价值的计算是以独立发挥生产能力的（ ）为对象的。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","分部工程",false,{"key":16,"text":17,"correct":14},"B","单位工程",{"key":19,"text":20,"correct":21},"C","单项工程",true,{"key":23,"text":24,"correct":14},"D","建设项目","2020版教材P307 新增固定资产价值的计算是以独立发挥生产能力的单项工程为对象的。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]