[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898983":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},898983,582,1,"单选题","社会投资项目采用预留保证金方式的，发承包双方可以约定将保证金交由（ ）托管。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","金融机构",true,{"key":16,"text":17,"correct":18},"B","发包人",false,{"key":20,"text":21,"correct":18},"C","财政部",{"key":23,"text":24,"correct":18},"D","政府部门","2020版教材P262 社会投资项目采用预留保证金方式的，发承包双方可以约定将保证金交由金融机构托管。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]