[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898955":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898955,582,1,"单选题","依据规定，因工程量偏差引起的可以调整措施项目费的前提是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","分部分项工程工程量偏差超过20%",false,{"key":16,"text":17,"correct":14},"B","分部分项工程工程量偏差超过20%，且引起措施项目相应变化",{"key":19,"text":20,"correct":21},"C","合同工程量偏差超过15%，且引起措施项目相应变化",true,{"key":23,"text":24,"correct":14},"D","合同工程量偏差超过15%","2020版教材P240 本题考查的是工程变更类合同价款调整事项。措施项目费的调整。当工程量偏差超过15%，且该变化引起措施项目相应发生变化，如该措施项目是按系数或单一总价方式计价的，对措施项目费的调整原则为：工程量增加的，措施项目费调增；工程量减少的，措施项目费调减。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]