[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898889":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},898889,582,1,"单选题","当采用经评审的最低投标价法时，根据《标准施工招标文件》的规定，主要的量化因素是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单价遗漏",true,{"key":16,"text":17,"correct":18},"B","一定条件的优惠",false,{"key":20,"text":21,"correct":18},"C","工期提前的效益对报价的修正",{"key":23,"text":24,"correct":18},"D","同时投多个标段的评标修正","2020版教材P216 根据《标准施工招标文件》的规定，主要的量化因素包括单价遗漏和付款条件等。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]