[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898829":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},898829,582,1,"单选题","其他项目清单中，无须由招标人根据拟建工程实际情况提出估算额度的费用项目是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","暂列金额",false,{"key":16,"text":17,"correct":14},"B","材料暂估价",{"key":19,"text":20,"correct":14},"C","专业工程暂估价",{"key":22,"text":23,"correct":24},"D","计日工费用",true,"2020版教材P187 其他项目清单由暂列金额、暂估价、计日工和总承包服务费组成，其中暂列金 额和暂估价均由招标人填写，投标人直接计入投标总价即可。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]