[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898762":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898762,582,1,"单选题","在可行性研究阶段编制投资估算，当编制建筑工程费用估算时，适合采用100m2断面为单位，套用技术标准、结构形式、施工方法相适应的投资估算指标或类似工程造价资料进行估算的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","桥梁",false,{"key":16,"text":17,"correct":14},"B","铁路",{"key":19,"text":20,"correct":21},"C","隧道",true,{"key":23,"text":24,"correct":14},"D","围墙大门","公路、铁路、桥梁、隧道、涵洞设施等，分别以公里(铁路、公路)、100平方米桥面(桥梁)、100平方米断面(隧道)、道(涵洞)为单位，套用技术标准、结构形式、施工方法相适应的投资估算指标或类似工程造价资料进行估算。2020教材P131-147",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]