[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898715":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898715,582,1,"单选题","确定项目生产规模的前提是项目的（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","盈利能力",false,{"key":16,"text":17,"correct":14},"B","资金情况",{"key":19,"text":20,"correct":21},"C","产品市场需求情况",true,{"key":23,"text":24,"correct":14},"D","原材料、燃料供应状况","2020版教材P120 制约项目规模合理化的主要因素包括市场因素、技术因素和环境因素，其中市场因素是确定建设规模需考虑的首要因素，而项目产品的市场需求状况是确定项目生产规模的前提。通过对产品市场需求的科学分析与预测，在准确把握市场需求状况、及时了解竞争对手情况的基础上，最终确定项目的最佳生产规模。 考前黑钻押题，金考典软件考前更新，下载链接 www.jinkaodian.com",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]