[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898708":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},898708,582,1,"单选题","下列有关预算定额的消耗量和单价，描述正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","人工幅度差属于其他用工",true,{"key":16,"text":17,"correct":18},"B","临时停机、停电影响机械操作时间不属于机械台班幅度差",false,{"key":20,"text":21,"correct":18},"C","预算定额基价包括人工费、材料费、机械费、管理费和利润",{"key":23,"text":24,"correct":18},"D","预算定额基价是根据现行定额和当地的价格水平编制的，故不具备稳定性","本题考查的是预算定额及其基价编制。选项B错误，临时停机、停电影响机械操作时间属于机械台班幅度差；选项C错误，预算定额基价包括人工费、材料费、机械费；选项D错误，预算定额基价是根据现行定额和当地的价格水平编制的，具有相对的稳定性。2020教材P76-84",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]