[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898683":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},898683,582,1,"单选题","概算定额与预算定额的差异主要表现在（ ）的不同。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目划分",true,{"key":16,"text":17,"correct":18},"B","主要工程内容",false,{"key":20,"text":21,"correct":18},"C","主要表达方式",{"key":23,"text":24,"correct":18},"D","基本使用方法","2020版教材P84 概算定额与预算定额的不同之处，在于项目划分和综合扩大程度上的差异，同时，概算定额主要用于设计概算的编制。由于概算定额综合了若干分项工程的预算定额，因此，概算工程量计算和概算表的编制，都比编制施工图预算简化一些。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]