[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898607":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},898607,582,1,"单选题","所有清单项目的工程量应以实体工程量为准，投标人在施工中可能的各种损耗和需要增加的工程量应（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","另列清单项目予以报价",false,{"key":16,"text":17,"correct":18},"B","考虑在投标报价的单价中",true,{"key":20,"text":21,"correct":14},"C","考虑在措施项目报价中",{"key":23,"text":24,"correct":14},"D","纳入风险费进行报价","本题考查的是分部分项工程项目清单。投标人投标报价时，应在单价中考虑施工中的各种损耗和需要增加的工程量。2020教材P44-47",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]