[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898600":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898600,582,1,"单选题","在工程量清单的编制过程中，暂列金额通常是由（ ）提供的。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","监理人",false,{"key":16,"text":17,"correct":14},"B","招标人与投标人协商后",{"key":19,"text":20,"correct":21},"C","招标人",true,{"key":23,"text":24,"correct":14},"D","投标人","2020版教材P49 暂列金额是由招标人提供的。最新题库考前黑钻押题，金考典软件考前更新，下载链接 www.jinkaodian.com",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]