[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898576":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},898576,582,1,"单选题","下列费用项目中，应由投标人确定额度，并计入其他项目清单与计价汇总表中的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","暂列金额",false,{"key":16,"text":17,"correct":14},"B","材料暂估价",{"key":19,"text":20,"correct":14},"C","专业工程暂估价",{"key":22,"text":23,"correct":24},"D","总承包服务费",true,"2020版教材P49 暂列金额和暂估价由招标人确定，投标人应根据招标人列出的金额计入投标总价中。总承包服务费的费率及金额由投标人自主报价，计入投标总价中。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]