[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898572":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},898572,582,1,"单选题","在工程量清单的编制过程中，下列内容中需要依据施工组织设计、施工规范、验收规范编制的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目编码",false,{"key":16,"text":17,"correct":14},"B","计量单位",{"key":19,"text":20,"correct":14},"C","招标文件",{"key":22,"text":23,"correct":24},"D","计算工程量",true,"本题考查的是工程计价基本程序。工程量清单的编制过程中，确定项目名称、确定项目特征、计算工程量需要结合施工组织设计、施工规范、验收规范。2020教材P37-39",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]