[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898571":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},898571,582,1,"单选题","对定额发布后工程建设中出现的新技术、新工艺、新材料、新设备等情况，应根据工程建设需求及时（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","制定新定额",false,{"key":16,"text":17,"correct":14},"B","全面修订定额",{"key":19,"text":20,"correct":14},"C","局部修订定额",{"key":22,"text":23,"correct":24},"D","编制补充定额",true,"本题考查的是工程计价基本原理。对定额发布后工程建设中出现的新技术、新工艺、新材料、新设备等情况，应根据工程建设需求及时编制补充定额。2020教材P39-42",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]