[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898558":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},898558,582,1,"单选题","工程量清单计价模式下，企业定额是编制（ ）的依据。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","招标控制价",false,{"key":16,"text":17,"correct":14},"B","招标文件",{"key":19,"text":20,"correct":21},"C","投标报价",true,{"key":23,"text":24,"correct":14},"D","清单工程量","2020版教材P40 本题考查的是企业定额的作用。在工程量清单计价方式下，企业定额作为施工企业进行建设工程投标报价的计价依据，正发挥着越来越大的作用。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]