[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-898446":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},898446,582,1,"单选题","下列各项中不属于其他项目费的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","暂列金额",false,{"key":16,"text":17,"correct":14},"B","计日工",{"key":19,"text":20,"correct":14},"C","总承包服务费",{"key":22,"text":23,"correct":24},"D","分包工程管理费",true,"2020版教材P19 其他项目费包括暂列金额、暂估价、计日工、总承包服务费。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程计价","建筑工程",0]